Laserfiche WebLink
� <br /> North Farm Road Neighborhoad Sanitary Sewer Improvement Project <br /> September 23, 2010 <br /> Page 2 <br /> The$7,500 cost can be assessed over a 15-year time period at a 6.25% annual interest rate. In <br /> addition to the connection cost, there is a SAC fee of$2,100. This SAC fee increases on an <br /> annual basis ($2,230 in 2011) and is payment for the additional costs of the future downstream <br /> capacity in the Metropolitan Council Sewer System. Also,the estimated property owner costs for <br /> the grinder pump station, service connection, and septic tank abandonment can range from <br /> $10,000 to $15,000 depending on the length of the service connection required. The City's <br /> current flat rate charge for residential sewer is approximately$109.72 per quarter. <br /> For properties with a conforming septic system, City policy allows continued use of the septic <br /> system as long it remains conforming. Connection to the sewer is required when the system <br /> becomes nonconforming, or requires major repairs or expansion. Property owners with <br /> conforming septic systems can choose not to be assessed for the project costs at this time, and <br /> then pay a lump-sum project connection fee at the time they want to connect to the sewer. The <br /> connection fee is based on the project assessment amount updated annually for inflation. The <br /> property owner can also be assessed for the project costs and continue to use the septic system as <br /> long as it remains conforming. <br /> After the Public Hearing is held, an Assessment Hearing will then be held, the project <br /> assessments approved, and a contract for project construction this fa11 will be awarded. <br /> The City of Orono has a Special Assessment Deferral Program available for property owners 65 <br /> years of age or older that meet specified income and assets criteria. Information ott this program <br /> is available from the City upon request. <br /> Please contact me at 952-249-4601 if you have any questions. <br /> Sincerely, <br /> �_������ <br /> Jessica Loftus <br /> Orono City Administrator <br /> Attachment <br />