My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Request fo opt out of sewer assessment
Orono
>
Property Files
>
Street Address
>
N
>
North Farm Road
>
1680 North Farm Road - 27-118-23-44-0010
>
Correspondence
>
Request fo opt out of sewer assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:23:20 PM
Creation date
9/29/2017 12:53:16 PM
Metadata
Fields
Template:
x Address Old
House Number
1680
Street Name
North Farm
Street Type
Road
Address
1680 North Farm Road
Document Type
Correspondence
PIN
2711823440010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- � o� <br /> o �,� o <br /> ����--=� CITY of ORONO <br /> � �"�.J ,;,--�;;� a, <br /> '� `�, :a`�� ,�ti Muni��pal offi�es <br /> ����a� ' O4�G Street Address: Mailing Address: <br /> E$S 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> September 23, 2010 <br /> R�: ?;�0�.rei, - D�±ab�r �1, 2Qln <br /> Notice of Public Hearing on North Farm Road Neighborhood Sanitary Sewer <br /> Improvement Project <br /> Dear North Fann Road Neighborhood Residents, <br /> Notice is hereby given that the Orono City Council will meet in the Council Chambers, <br /> 2780 Kelley Parkway, at 7:00 p.m. on Monday, October 11, 2010 to consider a sanitary sewer <br /> project for the North Farm Road Neighborhood pursuant to Minn. Stat. 429.011 to 429.111. <br /> Such persons as desire to be heard with reference to the proposed improvement will be heard at <br /> this meeting, or written comments may also be submitted to the City. This would be an <br /> assessment project with all of the project costs assessed to the neighborhood residents. <br /> A Feasibility Study has been completed for this project, and a pressure sanitary sewer system is <br /> being proposed in which each property owner will be responsible for the installation, <br /> maintenance, and operation of their own grinder pump station. The feasibility study reflected the <br /> inclusion of 9 properties on North Farm Road. The total estimated cost for the project is � <br /> $67,500. The estimated cost per parcel is $7,500, which includes the sewer line in the street and <br /> a service stub at the edge of the street Right of Way. This cost does not include the cost of <br /> installing the grinder pump station, installing the service connection from the sewer stub to the <br /> grinder pump staiion, or abandoning the septic system. <br /> A pressure system is being proposed because the estimated costs for a gravity sewer system with <br /> a �ity-owned lift station would be about $26,615 per property plus the costs for a service <br /> connection and septic tank abandonment. <br /> A neighborhood informational meeting was held on July 28, 2010. The project includes 9 <br /> properties on North Farm Road as shown on the attached map. Based on a petition received <br /> subsequent to the informational meeting, 7 of the 9 properties are supportive of the project. <br /> Telephone(952)249-4600 • Fax(952)249-461b <br /> www.ci.omno.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.