My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Lane
>
215 North Arm Lane - 06-117-23-24-0001/2
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:42 PM
Creation date
9/25/2017 1:57:52 PM
Metadata
Fields
Template:
x Address Old
House Number
215
Street Name
North Arm
Street Type
Lane
Address
215 North Arm La
Document Type
Septic
PIN
0611723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On the North Shore of <br /> Lake Minnetonka <br /> ON-SITE SEWAGE TREATMENT <br /> INSPECTION REPORT � POST OFFICE BOX 66 <br /> � . � � 1335 S. Brown Rd. <br /> Crystal Bay,MN 55323 <br /> � 473-7357 <br /> OWNER �!1��• �Y/19 �ov�ra SY: ADDRESS �/-� /U, H'Y/'Yl G-�1� <br /> PERMIT NO.'S. �7 � DATES 7 ��lS� CONTRACTORS �.� �{ <br /> City Ordinance No.210 requires that each on-site sewage troatment syatem in Orono be inspected on a roguler beaia.The onsite sewage <br /> trestment system at the above addreas h�been inspected and appears to fall into the category checked below. <br /> (This ia � an exiating syatem ❑ new construction) <br /> � � Mests or exceeda current City standards in all respects relating to deaig�,construction,and locetion.Appears to be operating <br /> P►oPer�Y. <br /> �2 Does not meet all current City standart� for new conatruction (1978 Code) but in most respects appears to be designed, <br /> located, and conatructed generally in axordance with previous codss.Syatem appears to be functioning properly;no major <br /> upgradinp of Me system is required at this time. <br /> � 3 Does not mest current City standerds in many respects relati�g to design,construction,or location.Appears to be operating <br /> edequately at this time,but has a relatively high potential for future problems. No major upgrading of system is required at <br /> this time. <br /> � 4 System may or may not meet current City standards for design,construction or location,but is failing to properly treat and <br /> dispose of the current input,and is endangering a water supply,or is a source of pollution to surface or groundwaters,or is <br /> creating a safety hazard,or is otherwise creati�g a public nuisance.Ple�e contact the City Inspector to discuss system repair/ <br /> replacement procedures. If drainfield replecement ia necessary,soil teating will usually be required,and a design and site plan <br /> must be submitted for review.Your contractor must obtain a permit before work is staned. <br /> SYSTEM CONDITION (m Checked items may require your action) <br /> Tank inspection indicatea: -�-�i Inapection pipe is located directly over tank baffle,(Doss not <br /> ❑ Pumpout not needed at thia time. give accurote m�aurement of solids accumulation.) �f�*�—. <br /> ❑ Solids accumulation in tanka indicates they ahould be pump- have not been pumped out within the last three years,t� <br /> ed out this year to help prevent future problems. sTi —ouTd pumpe out�ow. <br /> ❑ Solids accumulation in tsnks ia at a criticel level. Tanks Drainfie m . <br /> ahould be pumped out as aoon as possible. Q�Orainfield is dry,no surfacing evident. <br /> ❑ Syatem is discharging to surface. Tanka must be pumped ❑ Some evidence of surfaci�g,not critical yet. <br /> within 48 houn to eliminete surface ditcharge. O �rainfield is saturated and visibty discharging untreated <br /> ❑ Inspection risen missing—tanks could not ba inspected, effluent to the aurface. Thia condition may require replace- <br /> Inspection ritera (4"dia.pipe)muat be ins�lled in each tenk ment o� edditions to drainfield. Contact the City Inapector <br /> at next pumpout. If tenka have not been pumped out within immediately.Repairs must be completed within 90 days. <br /> the laat three years,they should be pumped out now, ❑ Drainfield exte�t and condition unknown. <br /> SITE CHARACTERISTICS: <br /> Limiting Site Factors Potential for System Failure Site Capabilities for <br /> ❑ Slope (dePends on soil types,water Future Expansion <br /> ❑ Soil table,and system condition) ❑ Adequate <br /> ❑ High wate�table ❑ Low �Fair <br /> � Lot size �Medium ❑Poor <br /> Q� Lake,wetland,or stream ❑ High . ❑ Inadequate <br /> ❑ Drainage ❑System is causing visible <br /> surface discharge. <br /> COMMENTS: <br /> ���/-�o <br /> Date of Inspection ptic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that <br /> this report does not guarantee or certify that an existing system will continue to function property,but is merely an opi�ion of the adequacy <br /> of the aystem under current conditions based on the available informatio�. <br /> This report must be kept o�the premises with system location and pumping records. <br /> WHITE COPY/Inspector's File GOLD COPY/Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.