Laserfiche WebLink
� �� <br /> . , <br /> 108.6-109.6 ADMINISTRATION <br /> 108.6 Refunds. The building official is authorized to estab- cal, plumbing, heating wires, pipes and ducts are <br /> lish a refund policy. approved. <br /> SECTION 109 109.3.5 Lath or gypsum board inspection. Lath and <br /> INSPECTIONS gypsum board inspections shall be made after lathing and <br /> gypsum board,interior and exterior,is in place,but before <br /> 109.1 General. Construction or work for which a permit is any plastering is applied or before gypsum boazd joints � <br /> required shall be subject to inspection by the building official and fasteners are taped and finished. <br /> and such construction or work shall remain accessible and <br /> exposed for inspec[ion purposes until approved.Approval as Exception: Gypsum board that is not part of a fire- <br /> a result of an inspection shall not be construed to be an resistance-rated assembly or a shear assembly. <br /> approval of a violation of the provisions of this code or of <br /> other ordinances of the jurisdiction.Inspections presuming to 109.3.6 Fire-resistant penetrations. Protection of joints <br /> give authority to violate or cancel the provisions of this code and penetrations in fire-resistance-rated assemblies shall <br /> or of other ordinances of the jurisdiction shall not be valid.It not be concealed from view until inspected and approved. <br /> shall be the duty of the permit applicant to cause the work to <br /> remain accessible and exposed for inspection purposes. 109.3.7 Energy efticiency inspections. Inspections shall <br /> Neither the building official nor the jurisdiction shall be be made to determine compliance with Chapter 13 and <br /> liable for expense entailed in the removal or replacement of shall include,but not be limited to,inspections for: enve- <br /> any material required to allow inspection. lope insulation R and U value, fenestration U value, duct <br /> system R value, and HVAC and water heating equipment <br /> 109.2 Preliminary inspection. Before issuing a permit, the efficiency. <br /> building official is authorized to examine or cause to be <br /> examined buildings, structures and sites for which an appli- 109.3.8 Other inspections. In addition to the inspections <br /> cation has been filed. specified above, the building official is authorized to <br /> make or require other inspections of any construction <br /> 109.3 Required inspections. The building o�cial, upon work to ascertain compiiance with the provisions of this <br /> notification, shall make the inspections set forth in Sections code and other laws that aze enforced by the department <br /> 109.3.1 through 109.3.10. of building safety. <br /> 109.3.1 Footing or foundation inspection. Footing and 109.3.9 Special inspections. For special inspections, see <br /> foundation inspections shall be made after excavations for Section 1704. <br /> footings are complete and any required reinforcing steel is <br /> in place. For concrete foundations, any required forms 109.3.10 Final inspection. The final inspection shall be <br /> shall be in place prior to inspection. Materials for the made after all work required by the building permit is <br /> foundation shall be on the job, except where concrete is completed. <br /> ready mixed in accordance with ASTM C 94,the concrete <br /> need not be on the job. 109.4 Inspection agencies. The building official is autho- <br /> rized to accept reports of approved inspection agencies,pro- <br /> 109.3.2 Concrete slab or under-floor inspection. vided such agencies satisfy the requirements as to qualifica- <br /> Concrete slab and under-floor inspections shall be made tions and reliability. <br /> after in-slab or under-floor reinforcing steel and building <br /> service equipment, conduit, piping accessories and other 109.5 Inspection requests. It shall be the duty of the holder <br /> ancillary equipment items are in place, but before any of the building permit or their duly authorized agent to noti- <br /> concrete is placed or floor sheathing installed, including fy the building official when work is ready for inspection. It <br /> the subfloor. shall be the duty of the permit holder to provide access to and <br /> means for inspection of such work for any inspections that <br /> 109.3.3 Lowest floor elevation. The elevation certifica- aze required by this code. <br /> tion required in Section 1612.5 shall be submitted to the <br /> building official. 109.6 Approval required. Work shall not be done beyond <br /> the point indicated in each successive inspection without first <br /> 109.3.4 Frame inspection. Framing inspections shall be obtaining the approval of the building official. The building <br /> made after the roof deck or sheathing, all framing, fire official, upon notification, shall make the requested inspec- <br /> blocking and bracing are in place and pipes,chimneys and tions and shall either indicate the portion of the construction <br /> vents to be concealed are complete and the rough electri- that is satisfactory as completed,or shall notify the permit <br /> 8 2000 iNTERNATIONAL BUILDING CODE� <br />