My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01400 - Demolition Permit
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
0300 Sixth Ave N PID: 25-118-23-41-0001 - OLD PID - Now: Mooney Lake Preserve
>
Permits/Inspections
>
2015-01400 - Demolition Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:59 PM
Creation date
7/31/2017 11:59:01 AM
Metadata
Fields
Template:
x Address Old
Address
0300 Sixth Ave N
Document Type
Permits/Inspections
PIN
2511823410001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' - • = BO LTON 8�- M � N K , I NC� <br /> � . Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200 • Chaska, MN 55318-1172 <br /> Phone(952)448-8838• Fax (952)448-8805 <br /> www.bolton-menk.com <br /> Easements: <br /> • All easements and right of way are shown on the Plat <br /> • Rain gardens that will be constructed on individual lots will need an approved plan and associated <br /> easement at the time of building permit <br /> Project Safety:Project safety is the Contractors responsibility. <br /> The General Contractor is responsible for their Subcontractars actions. <br /> Public Safety: Construction sites can be an attractive nuisance. <br /> Worker Safety: OSHA <br /> Competent Person - Gage Chaffee <br /> Sanitary Facilities: To be provided by the Contractor. <br /> Maintenance and Control of Traffic: Maintenance of traffic is the Contractor's responsibility. <br /> • Construction traffic will be contained to the development site <br /> • It is the Owner's responsibility to meet all Hennepin Couuty Requirements far work in the right of <br /> way and traffic control <br /> Storage/Staging: <br /> • Staging and storage will be contained to the development site <br /> Construction Concerns: <br /> • Access <br /> � Dust <br /> • Street cleaning <br /> • Parking <br /> � Rain Garden Construction <br /> Erosion Control: In place prior to start of construction. Must be maintained throughout construction. <br /> • Double silt fence is needed in buffer and wetland areas <br /> Other: <br /> • Attorneys will discuss determine who will record the Plat <br /> H:AORNO\C13109539\15-3739_Mooney Lake Preserve\Pre Con Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.