My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01400 - Demolition Permit
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
0300 Sixth Ave N PID: 25-118-23-41-0001 - OLD PID - Now: Mooney Lake Preserve
>
Permits/Inspections
>
2015-01400 - Demolition Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:59 PM
Creation date
7/31/2017 11:59:01 AM
Metadata
Fields
Template:
x Address Old
Address
0300 Sixth Ave N
Document Type
Permits/Inspections
PIN
2511823410001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � • � BO�TON 8� M � N K , I N C� <br /> � . Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200• Chaska, MN 55318-1172 <br /> Phone (952)448-8838• Fax(952)448-8805 <br /> www.bolton-menk.com <br /> Plan Revisions: <br /> • Final plan set dated 10/17/15 <br /> • Project scope includes: <br /> o Road construction (approximately 500') <br /> o Cul-de-sac construction <br /> o Driveway constructiou (approximately 300') <br /> o Mountable curb and gutter <br /> o Pond co»struction <br /> o Infiltration basin construction <br /> Landscaping Plan: <br /> • Entry monument <br /> • Teunis court improvements <br /> • Cul-de-sac center <br /> � Tree plantings <br /> Construction Schedule: <br /> • Approximately 8 days of work (weather depending) <br /> • Tree removals have begun <br /> • Equipment will be delivered to the site this week <br /> • Septic sites need to be fenced off before work begins <br /> • Work can begin once Plat is recorded (potentially Thursday or Friday) <br /> • Art Taylor should be kept ii7formed of project schedule <br /> • Art Taylor needs to be present for all test rolls including subgrade <br /> • Work on Prairie View will be completed as time allows <br /> Utilities: <br /> • Utilities will be installed in joint h�et�ch <br /> • Existing gas will need to be removed in location of pond and existing driveway <br /> • No road crossings are expected <br /> • Gas is located on east side of Hunter to serve lots <br /> • Small utilities will likely be installed next spriug due to time ofi year <br /> • Hennepin County will not allow work in the right of way after first snow fall <br /> • Xcel will serve new lots so new service will be required <br /> • Owuer will plan for temporary service to serve home construction tl�is winter <br /> • Small utilities need to be called out on the SWPPP <br /> Permits: NPDES <br /> MCWD <br /> Hennepin County <br /> • Copies of permits need to be provided to the City before work begins <br /> Financial Securities: <br /> • Bob Bean is reviewing cost estimates and will provide the City with security recommendations <br /> today <br /> H:\ORNO\C13109539\15-3739_Mooney Lake Preserve\Pre Con Minutes.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.