Laserfiche WebLink
� °'�.�� <br /> a o�, <br /> :�::�;,, . _ ��TY of URa1�0� <br /> v. <br /> Y1 ' <br /> ►a ��4'f A� sj7;� � �'' Municipal Offices <br /> �� ��;��;��;'4;r;..:��: � ti ddress: <br /> '� f���l'�; �r�i; , �:s Mailing A <br /> �;`.'� 11.<>F;.{:i�':'���-� Gi Street Address: <br /> ``- '� " `� � �:;/ P.O. Boz 66 <br /> \� �9 ''`'�'�`' 4�i 2750 Kelley Parkway <br /> �`�x����� Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> �l�,x /�i+ ,� y� -�' <br /> To: The Cunent Owner of Address ,��//S ��� 1� � � �� �f' S <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewaae treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No �. <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou?ht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> leaal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brouDht into compliance by: <br /> December 31, 2007 <br /> December 31, ZO10 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be seiviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> � -��-�,� . The tank(s) should be cleaned thxou�h�the manhole and <br /> not thro—u h e i sn pection pipes, tlus allows for proper cleaning. <br /> Comments: <br /> �• <br /> Inspect'�t;/�d4�x►�-x,+ ���'�'�__ Date of Inspection �t �tv <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br />