My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2015 Council Minutes
Orono
>
City Council
>
2015
>
03-09-2015 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 1:14:58 PM
Creation date
4/30/2015 1:14:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, March 9, 2015 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 37 of 43 <br /> <br />(14. BALDUR PARK ENGINEERING SERVICES, continued) <br /> <br />McMillan stated Orono is pretty good at having natural speed bumps all through the City and that the City <br />does periodically receive requests for speed bumps due to speed concerns. McMillan stated the City had <br />speed bumps installed in one area on Crystal Bay Road and that the residents had issues with them due to <br />the noise and vibration. McMillan stated she personally finds it hard to drive fast on Baldur Park Road <br />but that other people might not feel the same way. McMillan stated keeping the road narrow will help. <br /> <br />Printup moved, Walsh seconded, to direct Bolton & Menk, Inc., to commence survey testing and <br />design for the Baldur Park Road reconstruction project. VOTE: Ayes 5, Nays 0. <br /> <br />15. NAVARRE STREET LIGHT AND SIDEWALK PROJECT – PAY REQUEST NO. 5 <br /> <br />Edwards stated before the Council tonight is Pay Request No. 5 for the Navarre streetlight and sidewalk <br />project. Edwards stated the Navarre streetlight and sidewalk project is almost complete with the <br />exception of some punch list items that will be completed in the spring. <br /> <br />Walsh stated he wants to make sure enough money is retained to cover the punch list items. <br /> <br />Edwards stated there is, and that the few punch list items include some minor sidewalk corrections, <br />removal of some banner hangers on a light pole and a couple of other small items. <br /> <br />Walsh asked how much those items would amount to. <br /> <br />Edwards stated it probably amounts to $5,000 to $6,000 and that the City will be retaining $11,000. <br /> <br />Walsh moved, Cornick seconded, to approve Pay Request No. 5 for the contractor MP Technologies <br />in the amount of $17,040.29 for the Navarre Street Light and Sidewalk Project. VOTE: Ayes 5, <br />Nays 0. <br /> <br />*16. 2014 SANITARY SEWER REHABILITATION AND MANHOLE LINING – PAY <br />REQUEST NO. 1 <br /> <br />Levang moved, Cornick seconded, to approve Pay Request No. 1 for the contractor Insituform in <br />the amount of $176,770.21 for the 2014 Sanitary Sewer Rehabilitation & Manhole Lining Project. <br />VOTE: Ayes 5, Nays 0. <br /> <br />17. CYGNET AND CHEVY CHASE PARK STATUS <br /> <br />Printup stated he does not necessarily have a problem with changing the status on these two areas, but that <br />in the Comprehensive Plan it is labeled as undesignated open space. Printup stated the only concern he <br />had was whether there is the potential for future development if the City changes the designation of a <br />park. Printup noted he is speaking generally and not necessarily for these two parks. <br /> <br />Walsh stated it comes down to what are the consequences of doing this going into the future.
The URL can be used to link to this page
Your browser does not support the video tag.