Laserfiche WebLink
, � � � <br /> { <br /> ��T 03/18/2004 <br /> CONTINUED-BASEMENT <br /> DESCRIPTION � QUANTITY IJNIT COST RCV <br /> Stain&finish baseboard 73.08 LF 0.82 59.93 <br /> R&R Vinyl tile 706.71 SF By Others <br /> Room Totals: BASEMENT 8,725.40 <br /> - '�'�-� Room: Stairl <br /> ,zr T.. <br /> so;h M 'D <br /> � <br /> 1 163.62 SF Walls 78.83 SF Ceiling <br /> ^� = 242.46 SF Walls&Ceiling 37.75 SF FIoor <br /> 4.19 SY Flooring 31.17 LF Floor Perimeter <br /> 37.70 L.F Ceil.Perimeter <br /> DESCRIPTION QUANTITY ITIVIT COST RCV <br /> Remove Acoustic plaster over 1/2"gypsum lath 242.46 SF 0.79 191.54 <br /> Seal truss system 78.83 SF 0.84 66.22 <br /> Seal stud wall for odor control 163.62 SF 0.45 73.63 <br /> ��R /5 8"drywall-hung,taped,floated,ready for paint 242.46 SF 1.64 397.63 <br /> Carpenter-General Framer-per hour 1.25 HR 49.25 61.56 <br /> The above line item is for firing the walls out <br /> Seal then paint the walls and ceiling(2 coats) 242.46 SF 0.52 126.08 <br /> R&R Handrail-wall mounted 10.00 LF 6.88 68.80 <br /> Paint handrail-wail mounted 10.00 LF 0.61 6.10 <br /> R&R Stairway-3'wide(8'rise plus joist) 1.00 EA 505.58 505.58 <br /> 03160400001 Page: 19 <br />