Laserfiche WebLink
� � <br /> . • � <br /> ; <br /> MARIE WENDT ' <br /> 03/18/2004 <br /> CONTINUED-BASEMENT <br /> DESCRIPTION � QUANTITY IJNIT COST RCV <br /> R&R Board&batten style wall covering 353.35 SF 4.51 1,593.63 <br /> Half of the ceiling was cover with wood and battens <br /> R&R Recessed light fixture 2.00 EA 87.91 175.82 <br /> � R&R Smoke detector 1.00 EA 38.81 ;g,gl <br /> R&R HeadAC register 3.00 EA 18.53 55.59 <br /> R&R T&G paneli.ng-redwood paneling(unfinished) 511.58 SF 5.49 2,808.59 <br /> Stain&finish paneling 511.58 SF 0.86 439.96 <br /> R&R Wood window-double hung, 10- 15 sf 1.00 EA 306.43 306.43 <br /> Sea18c paint wood window(per side) 2.00 EA 23.42 46.84 <br /> Stain&finish door/window trim&jamb(per side) 2.00 EA 21.60 43.20 <br /> R&R Storm window-wood, I2-24 sf 1.00 EA 117.97 117.97 <br /> R&R Exterior door-metal-insulated/wood-High grade 1.00 EA 313.93 313.93 <br /> Paint door slab only-2 coats(per side) 2.00 EA 16.40 32.80 <br /> Stain&finish door/window trim&jamb(per side) 2.00 EA 21.60 43.20 <br /> Clean window unit(per side) 10-20 SF . 2.00 EA 7.57 15.14 <br /> Seal&paint wood window(per side) 2.00 EA 23.42 46.84 <br /> Paint door/window trim&jamb-2 coats(per side) 2.00 EA 16.67 33.34 <br /> Clean water heater 1.00 EA 11.93 11.93 �' <br /> Clean laundry tub 1.00 EA 730 7.30 <br /> R&R Baseboard-4"w/shoe-stain grade 73.08 LF 3.25 237.52 <br /> 03160400001 Page: 18 <br />