Laserfiche WebLink
Page 19 <br /> ORONO LANE - 10 <br /> Construction Cost 92,265. 09 <br /> Engineering 11,994. 46 <br /> Easement, legal, Admin. 30,320. 00 <br /> Bond ' 134,579.55 =10 = 13,458 lateral <br /> 1,023 Trunk <br /> 4� , 4� Total <br /> COUNTY ROAD 15 - 8 <br /> Construction Cost 46 ,790.74 <br /> Engineering ' 6,082. 80 <br /> Easement, legal Admn. Bond 24,256. 00 <br /> 77,129.54 = 8 = 9 ,641 <br /> NORTH SHORE DRIVE - 12 <br /> Construction Cost 163,900.94 <br /> Engineering 21,307.12 <br /> Easement, legal, 36,384. 00 <br /> 221,592.06 = 12 = 18,466 <br /> TRUNK COST - 55 units <br /> Construction Cost 49 ,796. 06 _ ----- <br /> Engineering 6,473. 49 _,__ <br /> __ 56,269.55 = 55 = 1,i�23 <br /> $1,204.668. <br />