Laserfiche WebLink
Page 17 <br /> COUNTY ROAD 15 - 8 <br /> Construction Cost $ 46 ,790.74 <br /> Engineering 6 ,082. 80 <br /> Easement, legal, Admin. 17,149.28 <br /> $ 70,022. 82 ; 8 = $8,753 <br /> NORTH SHORE DRIVE - 12 <br /> Construction Cost , $163,900.94 <br /> Engineer 21,307.12 ' <br /> Easement,legal 25,723. 92 <br /> 210,931.92 = 12= $17,580 <br /> TRUNK COST - 55 units � <br /> Construction Cost $ 49,796.06 <br /> Engineering 6,473. 49 <br /> 56,269.55 - 55 = $1,023 <br /> MINNETONKA BLUFFS - 26 units <br /> Construction Cost $240,679.71 � . <br /> Engineering 31,288. 36 _ ___—_- <br /> Easemerlt, legal, Admin. 55,735.16 <br /> - 327,703.23 = 26 = $42,604�lateral <br /> - unit <br /> FERNDALE ROAD - 19 Units <br /> Construction Cost � $271,408.45 <br /> Engineering 35,283.10 <br /> Easement, legal, Admin. 40,729.54 <br /> 347,421.09 ; 19 = $18,285 lateral <br /> - • 1,023 trunk <br /> 9,308 Total <br /> ORONO LANE - 10 <br /> Construction Cost $ 92,265.09 <br /> Engineering 11,994.46 <br /> Easement, Legal, Admin. 21,436.60 <br /> 25,696.15 : 10, = $12,570 lateral <br /> 1,023 trunk <br /> 3,593 Total <br />