Laserfiche WebLink
Page 2 <br /> Page 21 <br /> If the ready to serve charge is initiated, the residences and business <br /> establishments not currently connected should also be �charged the <br /> administrative fee to cover the billing, accounting and similar costs. <br /> The new rate components are: Operating Rate $ . 87/1000 gal. <br /> Ready to Serve Charge $7. 30/connection <br /> � Administrative Charge $2. 70/connection <br /> Unconnected Properties $10. 00/qtr <br /> With the new rate the minimum then becomes $10. 00 per quarter per customer, <br /> "Long Lake" Service Area: The existing rates are $. 77/1000 gal with a <br /> 6, 000 gal minimum at $5. 00. � <br /> It is recommended that the new rate be broken down between operating and <br /> maintenance on a gallonage basis, and an administrative charge on a connec• <br /> tion basis. The new rate components are: <br /> Operating and Maintenance $_ 72/1000 gal. <br /> Administrative Charge $4. 00/connection <br /> With the new rate the minimum then becomes $4. 00 per quarter p�r customer. <br /> (It should be noted that there are nine water customers on th� Long Lake <br /> system and only one is not a high volume user. ) <br /> "Wayzata" Service Area: The existing rates are 0-10 ,000 minimum $15.50 <br /> 10, 000 - 20,000 gal. 1. 01/1000 gal. <br /> 20 ,000 - 60,000 gal. . 78/1000 gal. <br /> over 60 ,000 gal. .54/1000 gal. <br /> It is recommended that the new rate be established as a flat rate per <br /> 1,000 gal plus an administrative charge on a connection basis. The new <br /> rate components are: <br /> Operation and Maintenance $1. 28/1000 gal. <br /> Administrative Charge $3. 00/connection , <br /> The minimum then becomes $15. 80 per quarter per customer for up to 10,000 <br /> gal. ($1.28 X 10 plus $3.00 administrative charge = $15. 80) <br /> Sewer Rates: <br /> The existing rates are $22. 75/qtr for those users charged on a unit basis <br /> and $1�50 per 1,000 gal of inetered water for those users charged on a <br /> gallonage basis. <br /> The recommended rates are $29.95/qtr or $1.50 per 1,000 gal of inetered <br /> water. The rate per 1, 000 gallons did not increase because the number <br /> �of gallons in relation to the costs increased. The unit has been in- <br /> creased from 60,000 to 100,000 gallons� The components of the new rates <br /> break down as follows: <br /> Quarterly Charge Per Unit <br /> MWCC Net Charges Billable 25,000 gal X $.512/1000 gal $12. 80 <br /> City of Orono Op. & Maint. Costs25,000 gal X . 620/1000 gal $15. 50 <br /> City of Orono Admin. Costs 25,000 gal X .066/1000 gal 1. 65 <br /> $29.95 <br />