My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-30-1980 Council Minutes
Orono
>
City Council
>
1980
>
01-30-1980 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 1:11:41 PM
Creation date
4/22/2015 1:11:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' REGULAR MEETING OF THE ORONO COUNCIL, JANUARY 30 , 1980 Page 30 <br /> 1. At the time the pumps were bid for the project, GRINDER STATION PROBLEM: <br /> the Prest Company was the supplier. (Continued*) <br /> 2. At the time of installation, the Ed. Petrocelli <br /> Company was the supplier. <br /> 3. At the present time , the nearest supplier is <br /> New York City. <br /> 4. At the time when we needed one repaired, it <br /> took the Petrocelli Company four months to <br /> repair it and return it to us. <br /> 5. We have discussed our problem with other <br /> municipalities and have found that they are <br /> experiencing the same problem. <br /> 6. There is no way to test the pumps to see if <br /> they are working properly during a weekly <br /> maintenance routine. <br /> 7. The pumps are not a submersible pump but they <br /> are exposed to a great amount of moisture <br /> which has been the cause of most of the problems. <br /> 8. We have a total of seven pumps of which five <br /> are operating now. (The spare pump we purchased <br /> is not operationg) <br /> In September, representatives of Environmental I <br /> came out to discuss our problem. A field study was <br /> done and we never heard from them again. <br /> Therefore, we have received bids for the type of <br /> pumps to change over the lift stations we have to <br /> a submersible type pump with a testing panel. If <br /> we replace one lift station per year, we should <br /> be able to salvage parts from the replaced pumps <br /> to keep the other two operating until replacement. <br /> The following companies have presented bids for <br /> replacement pumps : <br /> l. The Prest Company has the Meyers W.G. 20 <br /> Grinder Pumps @ $3, 517. 00 <br /> 2. Waldor Pump has the Torah model 12SGI Grinder <br /> Pumps @ $3 , 049. 50 <br /> 3. Tri-State Drilling Company has the Hydro-Matic <br /> model SPG200MZ Grinder Pump @ $3 , 172 . 55 <br /> 4. Hanson Pump Service has the Peabody-Barnes <br /> Grinder Pump @ $2, 879 . 00 <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.