My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00341 - septic
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
780 Lakeview Parkway - 06-117-23-43-0021
>
Septic
>
2017-00341 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:12 PM
Creation date
5/4/2017 10:55:51 AM
Metadata
Fields
Template:
x Address Old
House Number
780
Street Name
Lakeview
Street Type
Parkway
Address
780 Lakeview Pkwy
Document Type
Septic
PIN
0611723430021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ 0.45 gpd/ft` Absorption area Soit Loading Rate, which gives a mound ratio of 2.7 jminimum� <br /> lthis must match the soil boring log) desired mound ratio 2.7 <br /> _ , 10 percent site slope (0-20� range) 10 (�downslope site slope, if different than upslopel <br /> _ 22 inches, or 1.8 ft. to Redox or other timiting condition {need at teast 12"to be a Type I) <br /> Treatment zone contains�inches of 0�soil credit, and �inc#�es of 50%soil credit. Giving a: <br /> ��,, 14 inch, or 1.2 ft. Sand Lift Mound CRITICAL FOR FUTURE CERT{FICATIONS!!! <br /> =%� 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as fotlows:� <br /> =�� 0.0 ft. upslope and sideslope <br /> 17.0 ft. Dawnstope <br /> Individual stope ratios give BERM widths (topsoit beyond rockbed�of: <br /> '��� 4:1 upslope ratio 9 ft. upslope berm <br /> ���; 3:t sideslope 13 ft. sideslope berms <br /> �. 3:1 downslope 21 ft. downstope berm <br /> �•_� Overatl Dimensions: 10.0 ft. wide by 63.0 ft. tong Rock bed <br /> 40 ft. wide by 89 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> U slope berm 0 Downslo e berm 21 <br /> 12" cover on side5 <br /> (6"loamy csp&8"topsoil) <br /> �.Z Ctean sand lift <br /> _ . . _. . 1.8 t�epth tr� �.��i�.:,,� <br /> �. m.>�it�tn� C=o��,; . - � - _ <br /> Absor tian Width z7.o _ _ <br /> Note: <br /> For 0 to 1�stopes, Abso�ptian Widlh is measured from the 8edequally in both directions. <br /> For slopes >1�, Absorption Nh`dth is measured downhilt from the upslope edge of the Bed. <br /> ;;� Rock Bed: <br /> 10.0 ft. by 63.0 ft. by ��inches under pipe, plus 2��gives 21 yd'or"1.4= 29 ton <br /> Mound Sand: (note: votume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for toamy cap if desired) <br /> 20.1 up + 66.1 downstope + 11.1 ends + 38.9 under rock = 164 yd'or'1.4= 229 ton <br /> ptus 20% <br /> � Loamy Cap: <br /> 36 ft. by 85 ft. 6" deep, ptus 20�gives 6g yd'ar"1.4= 95 ton <br /> ���, Topsoit: <br /> 40 ft. by 89 ft. 6"'deep, ptus 20%gives gp yd'or'1.4= 112 ton <br /> I hereby ceAtify that I have completed this work in accordance with alt applicable ordinances. rutes and laws. <br /> _.__.____._,, <br /> Rusty otson's Soil & Perc 810 12/14/2016 <br /> ' esigner Signature Company License# Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.