My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-1979 Council Minutes
Orono
>
City Council
>
1979
>
08-28-1979 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 12:29:37 PM
Creation date
4/22/2015 12:29:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. � . �PAGE 2 Page 25 <br /> Johnson Bros. told Hennepin County that they would pull off County <br /> Rd. 15 and start construction on Orono Orchard Rd. Hennepin County <br /> reminded them that they lrnew that would not be allowed until County <br /> Rd. 15 and Tanager Bridge was open. <br /> Augus t 8, 197 9 <br /> Clayton Nolbe, who is in charge of the bridge construction for Henn- <br /> epin County called and said the� are as far as they can go on the <br /> bridge until Johnson Bros. completes restoration on the wes� side o� <br /> the bridge. <br /> Hennepin' County cannot complete the approaches to the bridge until <br /> that work is d.one. <br /> Zhe bridge is complete except for the approaches and once Johnson <br /> Bros. completed their work it would only take two days for them to <br /> construct the approaches. Clayton also mentioned that the Norenberg <br /> bridge would be open the week of August 27th and no later� than Sept- . <br /> emb er 1 , 1 97 9. <br /> August 9, 1979 <br /> 11 :1�0 called Ray Folland MWCC-not available to phone-12 :10 returned call. <br /> Mr. Ray Folland, I7irector of construction, Metropolitan Waste Control <br /> Commission stated that it had been determined �at corrections had to <br /> be made on County Road 15 on the west side� of Tanager Bridge. <br /> Uuring the construction of the seven foot wide trench, voids had been <br /> created under the concrete. It had been determined that to correct <br /> this an uneven line the length of construction had to be cut out and <br /> compacted properly. <br /> According to Ray this was attempted but in the process the blacktop <br /> mat on the side was being disturbed by way of separating from the <br /> concrete. Hennepin County then s�opped the construction until a <br /> method was developed to assure that would not happen again. <br /> Mr. Folland stated he was going to have a meeting with Herb Klossner <br /> today to try to resolve all the problems so that construction could <br /> begin on Monday August 13, 1979. <br /> � Mr. Folland stated that they ]�ew what had to be done on 15, Johnson <br /> Bros. �ew what had to be done on 15 and had started but were stopped <br /> because as they were diggin.g out to get to the voids the bituminous <br /> mat was being lifted off the concrete. <br /> Au�ta.st 10, 1979 <br /> Dave Feltl Hennepin County stated that on August 9th, meeting was held <br /> with Johnson Bros., Hennepin County Herb glossner, and Ray Folland M. <br /> W.C.C. . <br /> It was determined that construction would begin on the east side of <br /> Tanager Bridge on Monday August 13th and restoration on County 15 <br /> west of the bridge. Dave said that to accomplish proper removal of <br /> the concrete the b�tuminous ma ver the concrete mus�, be � t�o tk� <br /> flz7.1 depth of the bituminous (�"� to avoid the mat being li e �-�e <br />
The URL can be used to link to this page
Your browser does not support the video tag.