My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-1979 Council Minutes
Orono
>
City Council
>
1979
>
08-28-1979 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 12:29:37 PM
Creation date
4/22/2015 12:29:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. , _ Page 24 <br /> Tp ; W.R. Benson, Administrator <br /> FROM: John R. Gerhardson, Public Works Coordinator <br /> DATE: August 8, 1979 <br /> SIIBJECT: Status report on Ir�ter�eptor construction, Tanager Bridge and <br /> Noerenberg Bridge. _ <br /> Because of the delays in construction on the interceptor sewer <br /> construction and bridge construction I have been in contact with <br /> Hennepin County and the Metropolitan Waste Control Couanission. <br /> The following are the dates and names of people I have received <br /> , ,co�ents �om: <br /> Ji,1Y 30, 1979 <br /> Dave Feltl Hennepin County inspector stated �that Hennepin County <br /> was not going to allow Johnson Bros. to begin construction on the <br /> east side oP Tanager Bridge until the west side was completed. <br /> Zhe reason being that voids were created under existing concrete <br /> after the trench was dug and therefore could not be compacted to <br /> Hennepin County' s satisfaction. <br /> Ju�ly 31 , 1979 <br /> Don Kaster resident engineer Metropolitan Waste Control Co�rnmission <br /> thought there was approaimately 800 square feet oP additional con- <br /> crete to be removed on 15 on the west side of Tanager Bridge to get <br /> proper compaction. Don also stated that there are other areas �or <br /> Johnson Bros. to work until County Rd. 15 is restored before start- <br /> ing construction on Orono Orchard Rd. <br /> He agreed that County Road 15 and Tanager Bridge should be open <br /> before starting work on Orono Orchard Rd. <br /> � Au st 6 1979 <br /> Dave Fel 1 called wi.th the f'ollowin.g update on County Road 15. <br /> Dave sa.id that they had noti�ed Johnson Bros. earlier that they <br /> would not allow any construction on ,Cou.�aty Rd. 1 5 east of Tanager <br /> Bridge until they had received an agreeable schedule oP restoration <br /> to County Rd. 15 on the west side of Tanager Bridge. <br /> Johnsan Bros. had not satisfied Hennepin County' s requests and began <br /> work on the east side of Tanager Bridge on Monday August 6th. <br /> Hennepin County, with the assistance of the Hennepin County Sheriff <br /> stopped the construction Monday August 6. There wa.s a meeting and <br /> Johnson Bros. stated that they had not had enough time to deter�nine <br /> the method or schedule of completion of the restoration. Hennepin <br /> County told Johnson Bros. that they have had enough time and if <br /> they did not present that information within two days a11 construc- <br /> tion would stop completely. <br />
The URL can be used to link to this page
Your browser does not support the video tag.