Laserfiche WebLink
� Mr. Bernard J. Ilarrington <br /> � . ' � Page 2 . . Page 33 <br /> area connecting to the existing Orono sewer line that is avail- <br /> able near the Orono High School. Included in the engineering <br /> report is a proposed Long Lake bypass line. We will all benef it <br /> from this line. The bypass line will allow the 25 units in the <br /> Hackberry area to remain connected to the Long Lake system wh ile <br /> substantially reducing the f low of sewers where Long Lake has <br /> experienced backups in the past. Orono also benef its in that <br /> additional connections will be available for future hookups while <br /> allowing additional capacity in the Long Lake' s system. Medina <br /> benefits in that a sewer outlet through Orono is made available <br /> to the Medina Morningside area. <br /> The City of Orono, the City of Medina, and the City of Long Lake <br /> have all. approved the engineering report and have agreed to <br /> proceed with the project. Meanwhile, the City of Medina has <br /> applied for a grant, which I understand should be approved this <br /> fall, with a construction start next spring, 1980. - <br /> We are most anxious to complete the camprehensive sewer planning <br /> process. If you have any further questions, or if you wish . <br /> further infonnation, please feel free to notify me as soon as <br /> possible to allow us to adhere the timetable that is before us. <br /> Sincerely, � <br /> �r . Benson <br /> 1 <br /> City dministrator - <br /> WRB/cs - <br /> t t <br />