Laserfiche WebLink
REGULAR I��ETIiJG OF '�'HE OROP10 COUPiCIL, AU�US'?' 14 , 1979 Paqe 12 <br /> City Planner Alan Olson' s letter of Julv 7_6, 1979 BUILDTN� PLAN REVIEW <br /> to Iir. Robert PoPe regarding the First National 2465 Shadywood Road <br /> Bank of Navarre was reviewed by the Cit�� Council. �491 � <br /> � Navarre Bank <br /> Ilobody was present to represent the First rlational <br /> Bank of Navarre. Discussion included the encroach- <br /> r.ient into the LR-lA residential zone of approximately <br /> 50 ' on the site plan for the parkin_q lot instead of <br /> the approved 10 ' variance. It v�as also noted that <br /> the conceptually a��roved plan c�ntained 9, 60� sc�, ft. <br /> for the new bank and not includincr the ciotted line Q <br /> "alternate building" addition. Staff was also directed <br /> to contact the Bank to pursue a drivewav connection <br /> bet�•�een this pro�ert1� and Super ��alu. <br /> "layor Van Nest rloved, tiassengale seconded, to <br /> clarify the concePtual approval of a 10' variance <br /> rather than a 50 ' variance, as in letter, for the <br /> parking area for the First National Bank of_ �lavarre. <br /> ?iotion, Ayes (5) - Nays (0) . <br /> T4ayor Van Pdest r.loved, Hurr seconded, to table for <br /> two caeeks the ap�roval of building plans for the <br /> First :Jational Bank of Pdavarre in order to notifv <br /> the applicants and rec�uest chanqes in par}�ing <br /> - locations and/or building size so that all develop- <br /> ment occurs in the B-4 zone. PZotion, Aves (5) - <br /> Nays (0) . + <br /> Mr. Alan Olson, City Planner, entered into the CONnI'T'IOr7AL USE pERr4IT <br /> record the conditional use permit rec�uest of 7.683 Casco Point Road <br /> Loui� Smerling, 2683 Casco Point Road, dated #4q2 <br /> July 16 , 1979 , which states: Louis Smerling <br /> Purpose - restore lakeshore slones to original <br /> grade and to control erosion. <br /> The applicant has held up his conditional use <br /> application until the Alexander Holzer perrtit �aas <br /> coMpleted. The long del�avs involved with his <br /> neighbor' s application and the heav�� rains of this <br /> season have created a greater potential for additional <br /> erosion of the steep banks of his lakeshore property. <br /> Staff has called for action on the anplication for <br /> the July 23, 1979 neeting. - <br /> The enclosed letters have been sent to both the <br /> City Engineer and PiC��TD for review. `"he �roject <br /> involves a 32' long area along the bank. The <br /> supporting tir.iber structure or "retaining wall" will <br /> be subsurface with the necessary plantinc�s above. <br /> I have only one c�uestion that I will direct to the <br /> Citv Engineer involving the temporary step after <br /> seeding �r covering the bank with a nlastic and fiber <br /> mulch. The rest of the project appears to meet code. <br /> (Continued) <br />