Laserfiche WebLink
� REGULAR A2�E^ING OF '�'HE ORONO COUNCIL, APRIL 24 , 1979 Page 7 <br /> 4 . Access to Lots 1 & 2 to remain �s con- SU3DIVISION <br /> structed with a private easenent provided 2505 I:elly Avenue <br /> to Lot 1 over Lot 2 (Continued) <br /> 5. Platting aiid dedication of drainage and <br /> utility easertents along all lot lines except <br /> the shoreline. <br /> Staff Note - April 19, 1979 <br /> Staff would add the condition that the lagoon <br /> be platted as open water and appropriately <br /> dedicated to the public (Outlot A would be <br /> platted only on the land) . <br /> Council I�teeting - April 24, 1979 <br /> P�ayor Van Nest moved, Paurus seconded, to approve <br /> the preliminary subdivision for the �:elly Avenue <br /> � Holding Cor,ipany, 2505 Kelly Avenue, subject to the <br /> parking area at base of the driveway serving the <br /> two new dunlexes, be rer.ioved, and the only dr_ive <br /> area will be the driveway coming out onto Kelly <br /> Avenue; lot to be platted to delineate open water <br /> area; the outlot be described only as that part <br /> which is dry land, not open water; nrovide the <br /> City proof of existence for driveway easement over <br /> Lot 4; and Planning Corunission reconnendations of <br /> April 9, 1979 . tsotion, Ayes (4) - Nays (0) . <br /> P�ir. Alan Olson, City Planner, entered into the VARIANCE <br /> record the variance request of Enervest Builders/ 32Q Tonkawa Road & <br /> Donald Doty, 320 Tonkawa Road/325 Westlake Street, 325 Westlake Street <br /> dated February 27, 1979, which states : �460 <br /> Enervest Builders & <br /> The application is for a variance to Ordinance No. 219, Donald Doty <br /> the Stubbs Bay 1loratorium, to pernit action on a <br /> subdivision (lot line rearranger.tent) application. <br /> Enervest owns Lots 4 & 5, Doty owns Lot 6. The <br /> proposal is to trade land to permit construction <br /> on Enervest' s now vacant property. �'he land trade <br /> will not appreciably effect the total propertv <br /> areas of either owner' s property. The existing lot <br /> arrangertent severely restricts construction and <br /> all but nrecludes an on-site septic system on <br /> Enervest' s pro�erty because of the severe topography. <br /> The land trade atter.lpts to allevia�e these problems. <br /> �ven after such a subdivision, construction on the <br /> Enervest property would require variances to lot <br /> area, lot widtfi, and septic system standards . <br /> (Continued) <br />