Con' t. -2- Page 23 <br /> The detour for Shoreline Drive will be: <br /> [•7estbound detonr - Hwy. 12 to Long Lake to the stop l�ght at <br /> Bro�an Road South (Co. Rd. 146) IIrown Road South to North Shore <br /> Drive (Co. Rd. 51) east on tJorth Shore Drive to Shoreline Drive <br /> (Co. Rd. 15) � <br /> Eastbound detour will be the reverse of_ the westbound detour. <br /> You shoulcl also know that the sewer force main is a project of <br /> the rZetropolitan j•7aste Control Commission and not the City of <br /> Orono and that the Tanac�er Lake Bridc�e re�lacement is a project <br /> of Hennepin County Public j9orks and not the City of Orono. <br /> , The contractor for the sewer force main project expects to have <br /> a construction office in the area very soon with communication <br /> so as to accept calls and complaints. Until you are made aware <br /> of that telephone nurlber and you have questions or complaints, <br /> please contact Isr. Bill Moeller, Pietropolitan I•7aste Control <br /> Commission, 222-8423. . <br /> If you have questions or complaints about the Tanager Lake <br /> Bridge construction, contact Clayton r7olby, Hennepin County <br /> Public Works, 935-3381. . . <br /> The following is the schedule 'that has been set by the rietro- <br /> politan Waste Control and Hennepin County Public Works : <br /> 2iarch 15, 1979 <br /> Sewer pipe construction on North Shore Drive f rom Shoreline Drive <br /> to Brown Road South and sewer pipe construction at the channel <br /> at Tanager Lake. This construction should create only minimal <br /> inconvenience and �should not require road closings. This type <br /> . of construction should last only two weeks. <br /> April 2, 1979 _ <br /> Tanager Lake Bridge construction will begin and the detour will <br /> be in effect_ Hennepin County estimates the bridge being closed <br /> until July_ � ' , <br /> Also, on April 2nd, the sewer pipe construction will begin on <br /> Shoreline Drive from tlorth S�ore Drive east to Orono Orchard Road. <br /> The contractor will maintain at least one lane of traffic during <br /> construction to accommodate local and emergency vehicles, this <br /> segment should be completed by May l, 1979. <br /> April 15, 1979 <br /> Sewer pipe mnstruction �on North Shore Drive west to Old Crystal <br /> Bay Road one lane of traffic should be maintained. Construction <br /> of this segment should be completed the third week in *�ay. <br />