My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-1978 Council Minutes
Orono
>
City Council
>
1978
>
03-30-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:55:39 PM
Creation date
4/21/2015 3:55:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ . <br /> , • � .� � � Page 35 <br /> f�r. 6rad 1'an f;est. 1•;ayor <br /> � Ci ty of Orono - _ � <br /> �'a rch 15, 1978 � � <br /> Paoe Two , <br /> - The CSP i nd i ca tes tha t the Ci ty wi 11 i ni ti a te ��ha tever ac ti on i s <br /> necessary to provide adequate intercommunity sewer service in <br /> the future. The intercorr��nunity sev:er service agreerent between <br /> your City and the City of Long Lake for the Hackberry Nills states <br /> that some actian will be reouired by Orono upon tne completion of <br /> the Orono-Long Lake lnterceptor. l�Je assume that the City of Orono <br /> wi 11 fol l ow through on any i ntercorrnuni ty seti,�er needs that are <br /> necessary even though the interceptor (as a forcemain) will have a <br /> different location than the previously proposed gravity sewer. Since <br /> this action may require the installation of a local sewer within a <br /> five year peric�d, the CSP should be revised to include a description <br /> and tentative time schedule for this .improvemen"t. _ <br /> In response to your statements regarding the design of the Orono- <br /> Long Lake Interceptor, we again state that the design parameters _ <br /> (population served and time period) are as confirr�ed in our letter of <br /> March 1 , 1978. These design parameters are in accordance with the <br /> existing and projected sewerage needs of the area. It is the - <br /> responsibility of the Commission to provide faci7ities in accordance <br />� with local and metropolitan planning and determine a prudent design <br /> 7 i fe for the faci�i ty wni ch i s acceptabl e to the NJi nnesota Pol l uti on <br /> Contro7 Agency and the Env�ronmental Protection Agency. The Corunission <br /> . � be7ieves that it has carried out its responsibility ior the p roper <br /> - � design of this metropolitan interceptor_ - _ - - <br /> Very tru7y yours, <br /> - ' Bernard arringto <br /> Directo •f Engineering ' <br /> SJH:RAO:bdw <br /> cc: Metropolitan Counci7 • <br /> Minnesota Pollution Control Agency � <br /> - City of Long Lake , <br /> R. J. Dougherty., MWCC <br /> , . <br />
The URL can be used to link to this page
Your browser does not support the video tag.