My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-1978 Council Minutes
Orono
>
City Council
>
1978
>
03-30-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:55:39 PM
Creation date
4/21/2015 3:55:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. � �Page� 20 <br /> /3�.�.�, 2�, ;4��� � s4��;��, �:��. ���t��¢ ��..� <br /> .2335 ��✓. �z-ru:�i �{i�.u«f 36 O!!o G. Bcnttlrno, P.E. Lah�[nct F. Ftldsirn. P.E. <br /> j /� Fo6nl N'. Rosrnr, P.E. Glcnn R. Conk, P.E. <br /> �4. /��, f•'1l.-..ze�ala 55113 lesrph C. Andnllk. P.E. T.'ti�h A. Gnrdan, P.E. <br /> / Rradlord A. LtmLt�a. P.E. Thrmas L. !�'n��ts. P.E. <br /> ni14KP' 6.36-'i�60� RoLr.t D. F.iFomd. P.E. Finc�,d N'. Fosre., P.E. <br /> - Ri:ha.d E. Turnn. P.E. Fr,l-r.t G. S:nu�ichi. P.E. <br /> J.:mss C. Olsnn. P.E. !4,'�r�in L. Sona7¢. P.E. <br /> Dnnald C. IIurbc�dL P.E. <br /> T'rnntth R. 1lfeisltr, P.E. <br /> April 12, 1978 cha.r�s A. E.ickson <br /> Ltn Af. Pcx��lsky <br /> Harlan Af. O?son <br /> Honorable i�fayor and City Council <br /> City of Orono . <br /> Box G6 <br /> Crystal Bay, Minnesota 55323 <br /> Re : Ring Route <br /> Alternate �aluation <br /> Our File No. 139 <br /> Dear Mayor and Council: <br /> Pursuant to a request by the City Council, we have reviewed the proposed <br /> alignment of the Rino Route, outlined in the Preliminary Engineering Re- <br /> port dated October, 1977, and an alternate alignment along To���n Line Road <br /> suggested by a citizens' group. It is our conclusion that the original <br /> � alignn,ent proposed in the Preliminary Engineering Report should be selected <br /> by the City of Orono. Following is a general discussion of our analysis. <br /> We have examined, in a general way, the history involving the City's par- <br /> ticipation in the evaluation of Hennepin County Road 15 along the shores of <br /> Lake Minnetonka. The adverse affects of widening Co.Rd. 15 to a four lane <br /> arterial highway have been �oell documented. The traffic volume on Co.Rd. 15 <br /> is at or near the capacity of the existing roadway. The only viable alter- <br /> native to enlarging Co.Rd. 15 is to provide an adequate, usable alternate <br /> route to remove some of the total traffic from Co.Rd. 15. - <br /> The predominate traffic mwement is oriented to the east, towards the down- - <br /> town metropolitan area. Based on the configuration of Lake Minnetonka, the <br /> only feasible alternative to Co.Rd. i5 is a route that goes north of the <br /> Lake to T.H. 12 and then east. We concur with this concept and accept it <br /> as a given factor in the analysis of the proposed Ring Route alignment. <br /> The Ring Route, as proposed in the Preliminary Engineering Report, is 4,628 <br /> feet long (.88 miles) between Co.Rd. 19 and Co.Rd. 6 (Watertown Road) . Ttie <br /> estimated cost is approximately $505,000. The right-of-way requirements have <br /> been estiriated at 7.3 acres. The construction mentioned above is considered <br /> the first phase of a total improvement of the Ring Route concept. Additional <br /> work is contemplated by Hennepin County and by the State of Minnesota in order <br /> to complete the total route. <br /> The alternate aligrunent prepared by a citizen's group in the area is due north <br /> along the west municipal boundary, utilizing Town Line Road between Co.Rd. 6 <br /> and T.H. 12. The alternate alig;unent betiaeen Co.Rd. 19 and Co.Rd. 6 is 5,250 <br /> Page 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.