My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-1978 Council Minutes
Orono
>
City Council
>
1978
>
02-23-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:34:54 PM
Creation date
4/21/2015 3:34:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. Page S Page 45 <br /> . <br /> 3. The iietropolitan Council' s staff would recommend changes to the <br /> development framework ��oving the Pi.U. S .A. line so that it would <br /> be consistent with Orono' s ConPrehc-nsive Land Use Plan. <br /> It was further agreed by all present that the iietropolitan �4aste <br /> Control Comrnission would draft a new addendum to the engineering <br /> report for the Orono-Long Lake int�rcePi=or reflecting the reduction <br /> in flows and the aesignated sewer service area for final approval <br /> - before the construction of the interceptor itself. The Metropolitan <br /> Council staff agreed that it would further amend its review of the <br /> Orono Cor,�prehensive Sewer Plan and the Systems Statement reflecting <br /> the change and the aesignated se�ver service area of the interceptor <br /> as well as the change in the Pi.U.S .A. line itself. <br /> April, 1977: The City revised and resubmitted its October 1976 Comprehensive <br /> Sewer Plan in April, 1977. Changes were based on requests of the <br /> 1�It�CC and Metro Council staff r,�ade during the review process, and as a <br /> result of our final agreement reached at the March 11, 1977 meeting. One <br /> important change in the redraft, made at the request of the MWCC and <br /> � 1'letro Council staff, was to modify the scope of our plan, from a <br /> projection to the year 2000, to a projection to only 1990. All references <br /> beyond 1990 were removed with the understanding that the interceptor <br /> design was to only accommodate se�aer flows from the sewer service areas <br /> as defined on the sewer service area P4aps #2 & tt8 contained in the Orono <br /> Comprehensive Sewer Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.