Laserfiche WebLink
REGULAR M�ETIPJG OF TIiE ORONO COUrJCIL, JAPdUARY 23, 1978 Page 37 <br /> TANAGER LAKE CFiANNEL <br /> (Continued) <br /> 1. The channel crossing cleanout manholes shall be adequately supported <br /> to prevent settlement which could result in shearing or breaking of <br /> the pipe� <br /> 2. The channel banks shall be restored to a condition at least equal to <br /> existing, but in no case less than that which will produce a stable <br /> condition and will prevent erosion of bank material into the channel. <br /> 3. No channel excavation will be permited at any time when the currents <br /> in the channel will cause sediments and debris resulting from con- <br /> struction activity into Browns Bay. <br /> 4. Boat traffic in the channel will be maintained at all time. <br /> End of letter <br /> Council r4eeting - January 23, 1978 <br /> Paurus moved, Pesek secondeci, to approve <br /> the permit for the channel crossing at <br /> Tanager Lake Channel for the Orono-Long <br /> Lake interceptor per the City Engineer' s <br /> recomrnendations, plus adding: <br /> 1. Delineation line to save trees along <br /> right of way. <br /> 2. Construction of channel crossing at Tanager <br /> bridge and interceptor to be in one construction <br /> year. _ <br /> Motion, Ayes (3) - Nays (0) . <br />