My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-11-1977 Council Minutes
Orono
>
City Council
>
1977
>
10-11-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 2:30:06 PM
Creation date
4/21/2015 2:30:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> . RLGULAR P9EETING OF TI3E ORONO COUNCIL, OCTOBER 11, 1977 Page 17 <br /> � Parliar�ientary procedures requ:ires that all un- SUBDIVISION - DOCK <br /> finished items remain on the agenda until 500 North Arm Drive <br /> � decisions are made. Alan was evidently not (Continued) <br /> aware of this requirement when he eliminated <br /> � the subject from the agenda for September 19, <br /> 1977. The additional data as requested by the � <br /> City was not submitted at the time the agendas <br /> � were prepared. <br /> r The new maps enclosed indicate the depth sound- <br /> ings of the channel. On the afternoon of Sept- <br /> � ember 16, 1977, the ?'tayor, Ron Harnack, and <br /> Larry Seymour of the DNR and several others and <br /> r Hank I�uhich reviewed the area by boat. The <br /> • I�ayor' s boat draws 3 ieet of water, yet he <br /> would not attempt traveling the channel. Also <br /> � enclosed is a copy of a letter from the LP-1CD <br /> stating they nay not accept the application. <br /> r <br /> Planning Commission I�ieeting - October 3 , 1977 <br /> , <br /> • Mr. Cargill, Attorneys John Hacking and Don <br /> Sjostrom were present. The new dock and <br /> ' dredging proposal were very much the same as <br /> the original proposal which was previously <br /> � denied by Orono (a dock extending straic�ht <br /> to the channel from Lots 3 & 4 with an additional <br /> 200 ft. mooring dock parallel to the channel) . <br /> The dock for mooring would necessitate dredging <br /> � along the channel for accessibility. <br /> � Planning Commission reviewed proposal. Indicated <br /> � some objection to dredging. Suggested developer <br /> review further to come up with solution without <br /> � dredging. Possibly a change in location of the <br /> dock and consideration of a variance from the <br /> � dock length limits so as to rlinimize effect <br /> on fish spawning area along the shoreline of <br /> � the bay. <br /> � Mr. Hacking informed Commission that he had <br /> � been told that the DP1R would deny the L-shaped <br /> dock previously approved by Orono. Planning <br /> + Conunission requested some certification. P�Sr. <br /> Hacking replied this was only verbal as Ron <br /> � Iiarnack was out of town so he was unable to <br /> • obtain a statement. <br /> • The Commission considered deferring a decision, <br /> They suggested the developer submit alternative <br /> � proposal, i�ir. Iiacking insisted on a decision <br /> (approval or denial) . The Planning Comr�ission <br /> � informed the applicant a definite denial would <br /> only hold up the project. The applicant would <br /> � be required to wait six months before subraitting <br /> i another proposal. (Cont.inued) <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.