My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-1977 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1977
>
09-26-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 2:26:43 PM
Creation date
4/21/2015 2:26:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , � <br /> � RrGULAR MEE�l�'ING OF THE ORONO COUP�CIL, SEPTFi1BER 26 , 1977 Page 20 <br /> � I•1r. Greg Frank, City Engineer, informed the City TANAGER LAKE BRIDGE <br /> • Council that we have reviewed the subject plans <br /> and specifications and Construction Cooperative <br /> � Agreement between the County and Orono regarding <br /> t11e �i�anager Lake Bridge Improvement. The plans <br /> r are for a 36 foot wide bridge to be constructed <br /> with its centerline offset to the west of the <br /> � existing centerline. The east edge of the new <br /> • bridge will extend roughly� 3 feet farther east <br /> than the east edge of the existing bridge; while <br /> a the west edge of the new bridge will extend <br /> roughly 8 £eet father west than the west edge of <br /> � the old bridge. <br /> � On the west of County Road 15 , retaining walls <br /> are proposed on both the north and south sides of <br /> � the bridge. <br /> � The finished elevation of channel bottom beneath <br /> � the bridge will be 923. 0 , which coincides with <br /> the existing elevation. <br /> In regard to the Construction Cooperative Agree- <br /> � rnent, the City is responsible for: <br /> � 1. 50% of all land acquisition, easement, and <br /> ` �ermit costs. <br /> + 2 . 20% of all construction costs and design costs. <br /> � ihe total cost to Orono is estimated to be $21, 878. 33. <br /> � End of letter <br /> � Mr. Don Spielmann, County Design Engineer, comr;�ented <br /> � that Hennepin County would delay constructior. of <br /> the Tanager Lake Bridge if construction of the <br /> + interceptor is delayed in order to coordinate <br /> construction of both projects in one .construction <br /> � year. <br /> � Butler moved, 27assengale seconded, to defer until the <br /> • October 11, 1977 Council meeting to allow staff time <br /> to research rewording construction contract to <br /> � include language allowing coordinating of bridge <br /> and interceptor construction within same construction <br /> � year. P•Zotion, Ayes (4) - Nays (0) . <br /> � I�Ir. Greg Frank, City Engineer, reviewed a letter ORONO-LONG LAKE <br /> from his firm concerning the Orono-Long Lake IrITERCEPTOR <br /> � Interceptor, dated September 15, 1977, which states : <br /> � "The decision that an 18" force main is required for <br /> � the Orono line was based on hydraulic Probler.zs in <br /> operating two pumPing stations that discharge into <br /> � the same line. There is no greater capacity for <br /> Orono designed into the 18" pipe. (Continued) <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.