My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1977 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1977
>
07-25-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 1:56:27 PM
Creation date
4/21/2015 1:56:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� . , , <br /> � REGULAR MEETING OF THE ORONO COUNCIL, JULY 25, 1977 Page 15 <br /> � 3. If dredging and riprap plans cannot be implemented, NORTH STAR MARINA <br /> we are uncertain how to proceed. It would seem (Continued) <br /> � that in order to meet Orono and LMCD requirements, <br /> • the entire character of our business might have <br /> to be altered. It is uncertain what changes <br /> � and improvements the economics of these changes _ <br /> might permit. <br /> • <br /> For your information� the following is a schedule of <br /> � the most practical times of year to accomplish the <br /> projects under consideration: <br /> � <br /> � May 1 to Oct. 1 Dredging & riprap <br /> Oct. 1 to Nov. 15 Remove existing dock structures <br /> � Jan. 1 to March 1 Install new dock structure <br /> June 1 to Sept. 1 Building structures on la�d <br /> � July 1 to Sept. 1 Blacktopping <br /> Summer months Fencing <br /> � Summer months Curbing <br /> • Spring Landscaping <br /> � To summarize, the entire development plan hinges on <br /> the dredging and riprap plan already submitted. Only <br /> � with this and a favorable working relationship with <br /> Orono can we continue to develop the plan as out- <br /> � lined above. Without the ability to dredge and <br /> riprap this year, any plans will be delayed at least <br /> � one year, during which time our total comprehensive <br /> � improvement plan may change dramatically or be <br /> dropped completely in favor of continuing our operation <br /> � as it has been historically. <br /> � End of letter <br /> � Council tdeeting - July 25, 1977 <br /> � Mayor Van Nest stated that he assumed that North <br /> � Star Marina would submit an overall plan to the <br /> City. <br /> � Paul Iiempf replied that they do not have a dock <br /> � structure plan. This will take time, we want to <br /> work out all the details. <br /> � <br /> • Councilmember Butler asked why he could not take <br /> the docks out first and then dredge. Mr. Kempf <br /> � replied that he needs four feet of water to take <br /> the spoils by barge to Excelsior and if the water <br /> � drops another 4-6 inches, the barge will have <br /> problems navigating. We do want to proceed with <br /> � the dredging and riprapping. We have permits from <br /> the Minnehaha Creek Watershed District and the <br /> � Department of Natural Resources. <br /> �Mayor Van Nest: Orono needs a total plan to <br /> � determine what is going to happen. (Continued) <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.