Laserfiche WebLink
� <br /> • R�GULA�2 MEETING OF THE ORONO COUNCIL, JUNE 13 , 1977 Page 43 <br /> i The ciisturbed roadbed subgrade and wearing surface ORONO-LONG LAKE <br /> is restored to Hennepin County standards. INTERCEPTOR LOCATION <br /> (Continued) <br /> hat a high type overlay be placed over the width <br /> � of the existing roadway. <br /> � If there are any additional concerns you might have <br /> � on this choice of location for the force main, <br /> please give me a call. I will be happy to discuss <br /> � tllem with you. <br /> � End of letter <br /> � <br /> • Mr. Greg Frank, City Fngineer, informed the City CHANNELIZATION #19 & #89 <br /> Council that the City is in receipt of a letter <br /> � fror�l Hennepin County, dated May 19 , 1977 , stating <br /> that: <br /> � <br /> Enclosed for your information is a set of plans . <br /> � for channelization of the intersection of CSAH 19 <br /> • and CSAH 84. The channelization will provide a <br /> free right turn for southbound CSAH 19 traffic and <br /> � a free left turn for northbound CSAH 19 traffic. <br /> The eastbound CSAH 19 traffic to CSAH 84 and the <br /> � westbound CSAH 84 traffic will be required to stop. <br /> This project will eliminate the confusion and <br /> serious accident potential between the eastbound <br /> SAH 19 to CSAI� 84 movement and the northbound <br /> � CSAFi 19 movement. The island will also provide <br /> . separation of traffic through the present sharp <br /> curve. <br /> � This project is scheduled for 1977 construction <br /> � by our Maintenance forces. If you have any <br /> questions or desire further infornation, please <br /> � contact this office. <br /> � Mayor Van Nest moved, Butler seconded, to instruct <br /> • the City Engineer to request Hennepin County to <br /> defer this request until the Ring Route is completed <br /> � and the impact of this proposed channelization is <br /> known. To be entered on the June 27, 1977 Council <br /> � agenda for further information. Motion, Ayes (4) - <br /> Nays (0) . <br /> � <br /> � Mr. Don S. Spielmann, Hennepin County Engineer, TANAGER LAKE BRIDGE <br /> � requested Council approval of the permit application <br /> and final construction plans for the Tanager Lake <br /> � Bridge. Mr. Spielnann commented that the bridge <br /> is designed for a maximum width of 36 ' and is to be <br /> located not further than 12 ' west of the present <br /> structure. <br /> (Continued) <br /> � <br /> � <br /> � <br />