Laserfiche WebLink
r <br /> • RES�CHEDULED ORONO COUPICIL MEETING HELD MARCH 17, 1977 Page 20 <br /> � 3-11-77 Tentat�ively scheduled meeting with Metro NiETRO COUNCIL TIME <br /> staff, P'l�9CC, MPCA. ' SCHEDULE <br /> �3-18-77 Meeting with 1�4etro staff and P�aCC to (Continued) <br /> � discuss CSP approval. <br /> • 3-31-77 P�etro Physical Development Committee to <br /> adopt CSP. <br /> * 4-14-77 Metro Council scheduled to transmit the <br /> • final Orono Systems Statement (due prior <br /> to 7-1-77 at latest) . <br /> � Greg Frank, City Engineer, submitted a projected <br /> * sewage flows for the proposed Orono-Long Lake <br /> interceptor as follows: March 10, 1977 <br /> � <br /> � As requested, we have tabulated the projected sewage <br /> flows relative to the Orono-Long Lake Interceptor <br /> � for the following conditions: <br /> � l. Flows as tabluated from the Addendum to the <br /> Interceptor Report, Table 10 for Alternate A <br /> i (attached Exhibit A) . � <br /> � 2. Flow as tabluated in Table 10 less flows from <br /> the following areas: Maple Plain, Baker Park, <br /> � P4edina, and Vo-Tech. The Medina-R4orningside <br /> flows were included in this tabulation <br /> � (attached Exhibit B) . <br /> � 3. Flows as outlined in the Orono Comprehensive <br /> Sewer Report and delineated in your memorandum <br /> � to the Metropolitan Waste Control Commission <br /> * on December 1, 1976 (attached Exhibit C) . <br /> + End of letter <br /> � See attachments Exhibits A, B, & C <br /> � <br /> i <br /> � <br /> • <br /> ! <br /> • <br /> i <br /> • <br /> • <br /> � <br /> � <br /> • <br /> • <br />