My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-1977 Council Minutes
Orono
>
City Council
>
1977
>
01-10-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 2:27:56 PM
Creation date
4/20/2015 2:27:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� . <br /> 7 <br /> • OROP10 COUNCIL P�IEETING HELD JANUARY 10 , 19 7 7 Page 16 <br /> � Massengale moved, Butler seconded, to approve VO-T.sCH SCHOOLS <br /> .l documents and enter them into the Vo-Tech (Continued) <br /> e �chools r�cord. P7otion, Ayes (4) - Nays (0) . <br /> � Proposed Location of Vo-Tech School in riedina and <br /> ` its �ffect on Orono Residents - December 28, 1976 <br /> • lo The increased traffic along Old Crystal Bay <br /> Road which fronts the Orono Schools will add <br /> � to the existing traffic hazard along the road <br /> and at the intersection of Old Crystal Bay <br /> � Road and Highway ##12 and thus result adversely <br /> on the safety and welfare of Orono residents. <br /> • 2. Additional municipal services would be required <br /> from Oro�o if the Vo-Tech is located along <br /> � Orono's boundaryo This would result in an <br /> � added financial burden to the residents of Orono. <br /> a. Police - T_�affic control and security, <br /> � be Sewer - T�Tunicipal trunk line servicing school. <br /> cv Streets - Preserve and maintain. <br /> • <br /> 3, The urban nature of a school would be in conflict <br /> � with OL1�" comprehensive plan which designates <br /> i this �_�ea Gs rural, Also conflicts with our <br /> rural residential zoning of this district. <br /> � Our comprehensive sewer plan has been designed <br /> � to service existing problem areas for the <br /> health, safety and welfare of the public - not <br /> • for the purpose c�f increasing development. <br /> �5e The ins�al_lation of sewer interceptors on trunk <br /> � lines in this area will lend to a more dense <br /> developr�ent which will result in a higher <br /> � degree o� hardcover, thereby increasing the <br /> rate of flou� of storm water runoff. The <br /> � increasecl runoff ratio will add to the <br /> pollutien of the lake and ground water storage <br /> � thus arfer-�inq the health, safety and welfare <br /> . of the general public. <br /> �6. Urbanization of this area will have a deleterious <br /> effect on the environment and ecology of the <br /> � City and o��^e again affect the health, safety <br /> and v�elfare o� the general public. <br /> � <br /> +7. This same urbanization will result in pollution <br /> and the requirement of municipal sewer systems - <br /> � a financial burden to the residents of Oronoo <br /> �8, Incr�cs_�c� -�raffic from the proposed site will <br /> � only complicate existing traffic hazards along <br /> local, County and State corridors, yet we have <br /> never been able to obtain a firm commitment <br /> � frcm th�� County or State departrients for <br /> future i.m.provements. (Continued) <br /> � <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.