My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1976 Council Meeting Minutes
Orono
>
City Council
>
1976
>
09-13-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 12:07:20 PM
Creation date
4/20/2015 12:07:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� OBONO COUNCIL b1E�TING HELD SEPTEP�BER 13, 1976 Pa e 2 <br /> � g 5 <br /> ' The Flennepin County Health Department will SG�IIDIE FLU CLINICS <br /> • administer the entire program including all (Continued) <br /> � news coverage, Star, Tribune, Sun and PZaverick <br /> newspapers, radio, poster and flyers, etc. Each <br /> � comriunity ��ill receive further information <br /> and details at a later date. <br /> • <br /> � Dick I3enson, City Administrator, infornled the City HUT�1 RIGHTS COT�II�ZISSIOZI <br /> Council that the Human Rights Commission will call <br /> • a meeting for the 23rd of September at 7a30 P.A-Io <br /> � to discuss future goals and member status. <br /> � Mro Greg Frank, City Engineer, stated that the t^7ILLOi^I DRIVE PROJECT <br /> � majority of the work on the [�Jillow Drive project <br /> is completed. All that remains i� the stripinq <br /> • and some seeding. [•Je expect that this work will <br /> . be done within the next month, at which time, the <br /> project will be finalled out. <br /> � The seal coat work which Buffalo Bituminous did <br /> r at their ocm expense to correct the unsatisfactory <br /> surface of the street has also been completed. <br /> • <br /> • ilr. Greg Frank, City Enqineer, stated that the TRAFFIC SIGNAL <br /> �Contractor for the school light project, Egan- #12 & Old Crystal Bay <br /> i:icICay, requested by telephorie that a time extension Road <br /> � be granted for the cornpletion of this project. <br /> Accordinr, to the contract documents, all work was <br /> � to be com�leted by August 15, 1976. The basis <br /> for the time extension is that the Contractor has <br /> • experienced delays in receiving electrical <br /> equipment necessary for the project completion. <br /> �' Once the equipment is available to the Centr.acto�, <br /> � final project completion ��ould require one <br /> additional day of work. <br /> • <br /> I^le have requested that the Contractor submit a <br /> � written request for a time extension, including <br /> the reasons for the request, <br /> • <br /> � Our recommendation to the City is to defer action <br /> until that time at which the request is received, <br /> � ���hich should be within a weeko The Contractor <br /> has performed all work to date in a satisfactory <br /> � manner, <br /> • <br /> PIr, Greg Frank, City Engineer, submitted to the SCOTCII PINE LANE <br /> � City Council a drainage and utility easement for �rainage Easement <br /> � the Scotch Pine Lane area. The easement will <br /> e reviewed and signed for the September 27, 1976 <br /> ouncil meeting. <br /> • <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.