My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00127 - new structure
Orono
>
Property Files
>
Street Address
>
B
>
Bridgewater Drive
>
769 Bridgewater Drive - PID: 33-118-23-12-0088 - New Address, New PID
>
Permits/Inspections
>
2017-00127 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:41 PM
Creation date
4/27/2017 9:51:14 AM
Metadata
Fields
Template:
x Address Old
House Number
769
Street Name
Bridgewater
Street Type
Drive
Address
769 Bridgewater Drive
Document Type
Permits/Inspections
PIN
3311823120088
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Erosion Control Supplemental Information <br /> Final Stabilization will be provided with (seed, sod, etc): � �� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> �'`� Off site _Indicated on site plans _Other(description): _Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone, whichever is greater, of all vegetation to be retained. <br /> �Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan must roa�tinely inspect the construction site once every seven days da�ring active <br /> constrz�ction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records rnz�st be retained with the erosion control plan and made <br /> available at the District's request within 24 hoz�rs. Records of each inspection and <br /> maintenance activity shall inclz�de: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities); and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name J ti�►1/J W 1�'�r 1 �',� <br /> Organization �, O!��y�I�Ir L � p 1�i �►�t� S a wC T <br /> Phone ��� /�•�0 �9' Alternate Phone � 5i� ',3 y S �Q ��3 <br /> Email ���VJ �. W 008��iM�L e V i �1�G�l.J . (,'0 N+� <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> �"�,.�_ ..���..� ' . <br /> Sign�ature of Applicant or Authorized Agent Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.