My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00127 - new structure
Orono
>
Property Files
>
Street Address
>
B
>
Bridgewater Drive
>
769 Bridgewater Drive - PID: 33-118-23-12-0088 - New Address, New PID
>
Permits/Inspections
>
2017-00127 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:41 PM
Creation date
4/27/2017 9:51:14 AM
Metadata
Fields
Template:
x Address Old
House Number
769
Street Name
Bridgewater
Street Type
Drive
Address
769 Bridgewater Drive
Document Type
Permits/Inspections
PIN
3311823120088
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lhristine Mattson <br /> From: Adam Edwards <br /> Sent: Monday, February 13, 2017 1:14 PM <br /> To: Christine Mattson � <br /> Cc: Roger Peitso; Mike Gaffron; Melanie Curtis <br /> Subject: RE:765, 767 &769 Bridgewater Drive (2017-00123, 2017-00125 &2017-00127) <br /> Chris, <br /> I've reviewed the subject grading plans and stamped them approved with revision. <br /> 1. The water service connections must be protected from construction traffic during construction. The one for 767 <br /> is shown in the driveway at the construction entrance. Failing to protect these can result in water line breaks. <br /> 2. Street cleaning-Streets shall be cleaned and swept within 24 hours whenever tracking of sediments or soils <br /> occurs and before the site is left idle for weekends. <br /> 3. Perimeter sediment control measures should be installed by the Contractor and inspected by the City prior to <br /> any work, including demolition. Contractor must provide minimum 24 hour notice prior to inspection. <br /> 4. A separate utility permits will be required for the sewer and water connections. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday, February 13, 2017 12:10 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Cc: Roger Peitso<rpeitso@ci.orono.mn.us>; Mike Gaffron<MGaffron@ci.orono.mn.us>; Melanie Curtis <br /> <MCurtis@ci.orono.mn.us> <br /> Subject:765,767&769 Bridgewater Drive(2017-00123, 2017-00125&2017-00127) <br /> Adam, <br /> We received building permits for a new three home,townhouse. We did not receive enough copies of the building plans <br /> (additional copies have been requested), but thought I could get you started on the engineering review. <br /> Thank you. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway S Orono S MN � 55356(physical address) <br /> PO Box 66 0 Crystal Bay I MN I 55323-0066(mailing addressJ <br /> '� 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � �] www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Monday, February 20, 2017 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.