Laserfiche WebLink
� <br /> � ORONO COUNCIL NIEETING HELD SEPTENIBER 8, 1975 Page 6 <br /> r <br /> SUZ�ZARY OF 1973-1 SANTTARY SEW�R PROJECT COSTS AND ASSESSMEi�TTS <br /> � la Contract with General Contractor $1,233,000 <br /> � 2. 5ervices by City Consulting Engineer <br /> r a. Engineering '72, g52 <br /> � b. Inspection 57,381 <br /> c. Surveying 43,643 <br /> d. Easement Preparatiori and Negotiation 20,143 <br /> • <br /> ` 3, Right-of-Way Costs 16,650 <br /> 4. Soil Tests 2,Qp� <br /> � 5. City Attorney costs in condemnation, 10,000 <br /> � easement preparation, negotiation <br /> + 6. Bond Consultant 8,000 <br /> 7. Cost of publishing and mailings of 1,442 <br /> � notices of hearings <br /> • 8, Cost of preparing and publishing 8,000 <br /> � assessment roll <br /> 9. Administration overhead cost to City 15,000 <br /> � 10. Bond Discount 34,000 <br /> 11. Net Interest During Construction 100,000 <br /> Total Cost $1,622,118 <br /> �' Amounts to be deducted <br /> � $ 25,000 Truck <br /> t, 8,000 Oversizing of pipe <br /> 115,000 Possible future assessments <br /> r 7,600 Trunk acre assessments <br /> S $155,600 -155,600 <br /> To be assessed $1,466,518 <br /> w <br /> � Front Foot amount - 40� of $1,466,518 = $586,607 <br /> Unit amount - 60� of $1,466,518 = $879,911 <br /> • <br /> Front Foot Amount = $586,607 = 18016 per front foot <br /> � Total Front Footage --� <br /> ` Unit Amount = $879,911 = $3, 825.70 per unit <br /> � Total Units 230 <br /> • <br /> � <br /> � <br /> • <br /> • <br /> • <br />