My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-1975 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1975
>
09-08-1975 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 2:45:34 PM
Creation date
4/17/2015 2:45:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> i' ORONO COUNCIL NIEETING HELD SEPTEMBER �s, 1975 Page 5 <br /> � Benson noted that the Metropolitan Council is <br /> �charging the City $28,000 a year for the operation <br /> of the Orono sewer sys��rit. Therefore, this amount <br /> � must be paid for by con�ection charges in part. <br /> � There followed general di.�cussion concerning the <br /> possibility of c�eferring the �ssessments for one <br /> � year and assessing the properties next year. It <br /> was noted that the cogt to the City in doing <br /> � so would be approximately $100,000 in interest. <br /> � Searles noted that he had spoken to John Bolen, <br /> Chairman of the Metropolitan Council and the <br /> � latter stated that there was no money available <br /> for lateral sewer systems such as those in this <br /> r project. The P•letropolitan Council is financing <br /> t only interceptors that benefit entire communities. <br /> ` Long presented an overview of the sanitary <br /> sewer project costs and assessments, He reviewed <br /> � the amount of the contract with the general <br /> contractor, the amount for the services rendered <br /> • by the City Consulting Engineer, the amounts <br /> related to right-of-way costs, soil tests, City <br /> � Attorney costs, bond consultant costs, cost of <br /> � preparing and publishing assessment roll, cost <br /> of publishings and mailings of notices of hearings, <br /> � administration overhead cost to City, bond <br /> 3iscount cost, and net interest cost during <br /> � construction. He thereafter discussed those <br /> items which the Council had previously reviewed <br /> � and decided would be deducted from the amount <br /> � to be assessed, Thereafter followed general <br /> discussion by Long and presentation to the Council <br /> � and public concerning the above figures and <br /> the formula for the assessment as previously <br /> � discussed, Set forth hereinafter in the Minutes <br /> is a summary of those costs and assessment formulas <br /> • as presented by Long. <br /> � <br /> � (Continued) <br /> • <br /> � <br /> � <br /> I <br /> • <br /> • <br /> � <br /> • <br /> ! <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.