Laserfiche WebLink
� � . . <br /> � ORONO COUNCIL MEE'�tNG HELD JULY 8, 1975 Page 13 <br /> • <br /> in Fiscal 1976 with the revision prev�ously ORONO ORCHARD ROAD <br /> � mentioned, at no cost to the City, BRIDGE <br /> � (Continued) <br /> The City Council, at that time, indicated that <br /> � they wished to have the bridge revised, so that <br /> adequate sight distance would be provided af�d <br /> � that they would wait until Fiscal 19'�6 ft�r the <br /> construction. <br /> ! <br /> We would like to have some clarificatiort on the <br /> • Department of Natural Resources plans �or this <br /> bridge. The revisions proposed in the receht <br /> � plans are not satisfactory to the Ci�y. " <br /> � Mayor Searles requested this item to be placed on <br /> � a future agenda when more information is available. <br /> • <br /> Skip NlcCombs, City Engineer, submitted a report PItEVIOUS SEWER CO5TS <br /> � reviewing past sewer assessments in Orono and <br /> � a comparison of these assessments with a <br /> constructive cost index from 1963 to 1974 and <br /> � project costs adjusted to 1974 pr3.ces. <br /> • <br /> The City Engineer presented a progress report HACKBERRY HILL SEWER <br /> regarding the Hackberry Hill sewer project. <br /> The City Engineer was requested toe <br /> � 1, Document sewerage discharging iri the <br /> � Hackberry area creating a h�alth hazard. <br /> r 2. To proceed wi�h �in��.izing co�ist��iCt�on <br /> and required in�ilter�t3dn t�sts tln netal� <br /> • installed sew�r lihes. <br /> � 36 To dr�ft a 1�t�ceY �i�� Gt�uncil re�ti�w and <br /> � approval requestirig r�sidents to connect to <br /> sewers when �vai].able. <br /> • <br /> � t•2r. Skip McCombg, Orono City Engineer, discussed GROUNDWATER STUDY <br /> the Orono grounc�water study and the effects <br /> • of septic systems on the groundwater in locally <br /> � developed areas, Stubbs Bay, Crystal Bay, and the <br /> Ferndale Road areas. Conclusions were there is <br /> � evidence of deterioration of groundwater in <br /> these areas and a realistic approach in handling <br /> � on-site disposal systems in isolated areas is <br /> necessarye The Engineer was requested to estimate <br /> • costs for further percolation tests to determine <br /> soil conditons in the Stubbs Bay area. <br /> • <br /> • <br /> • <br />