Laserfiche WebLink
. ' � � 6. Perimeter erosion control must be installed by the Contractor and inspected by the City prior to any land <br /> disturbance. Contractor must provide minimum 24 hour notice prior to work. <br /> - Are you wanting the entire perimeter of the site to be protected ?This seems a bit excessive as a <br /> majority of the perimeter will be undisturbed as it is conservation area. <br /> 7. Protection fencing must be installed around bioretention areas prior to land disturbance. <br /> 8. Provide City with copies of any other agency permits required for the remediation, and provide information <br /> as to disposal site. Our intent is to have a clear understanding of all aspects so that we are in a position to <br /> answer questions from the public if asked. <br /> 9. Preconstruction meeting required to review on-site and off-site haul routes,site access points, etc. (provide <br /> a map)and to confirm for all parties the location and positive protection of septic sites and other areas where <br /> vehicle traffic must be avoided. <br /> 10. The Contractor and City Engineer to review pavement on any City streets along haul route together to <br /> confirm existing condition and document with pictures. The Applicant to be responsible for any repairs <br /> necessary due to adverse impacts caused by hauling. <br /> 11. Developer to notify neighboring property owners prior to commencement of remediation activity and <br /> provide developer's contact information to address any related concerns during remediation. <br /> Please contact me if you have any questions. <br /> Mike <br /> Michael P.Gaffron <br /> Senior Planner <br /> City of Orono <br /> (Street Address)2750 Kelley Parkway <br /> (Mailing Address)P.O.Box 66,Crystal Bay,MN 55323 <br /> Phone:(952)249-4622 <br /> Fax: (952)249-4616 <br /> 2 <br />