Laserfiche WebLink
� ' <br /> � NIINUTES OF A COUNCIL P�IEETING HELD DECENIBER 10, 1974 Page 5 <br /> � <br /> � No action was taken on the moratorium. MORATORIUM <br /> � Searles moved, Paurus seconded, to request the ZONIIVG PROPOSALS <br /> • legal department to redraft the zoning rpoposals <br /> and resubmit them to the City Council> Motion, <br /> • Ayes (5) - Nays (0) . <br /> • <br /> � The City engineer reported on the petition of DRAINAGE RAVINE <br /> residents between 4719 and 4745 North Shore North Shore Drive <br /> � Drive concerning a drainage ravine at that <br /> locationo The City Council requested the <br /> • engineer to proceed with negotiating recommend- <br /> � ed solutions through the DNR and Asinnehaha <br /> Creek Watershed District. <br /> � <br /> � The City engineer reported on the status of the LONG LAKE SE�rIER <br /> Long Lake sewer line serving the Orono rural CAPACITY <br /> � residential area located on property east of <br /> the Orono S_c':ools on Highway #12. It was <br /> • reported that the treatment plant, lift station <br /> � and lines were inadequate to carry capacity if <br /> allowed to connect to the present system, It <br /> � was also reported that there was inadequate <br /> capacity in the water booster station to supply <br /> water to the proposed development. <br /> • Butler moved, Tyiassengale seconded, to request FEASIBILITY STUDY <br /> the engineer to complete a feasibility study and <br /> � report back to the Council on January 14, 1974. <br /> Motion, Ayes (5) - P]ays (0) . <br /> • <br /> � The City engineer presented a progress report TYLER COMPLAINT <br /> on the Tyler-Jameson complaint at 3508 Ivy Place. <br /> • <br /> � The City Council recommended that the Department ORONO ORCHARD ROAD <br /> � of Natural Resources widen the clear span to BRIDGE <br /> 34 feet, including moving the West Bent to improve <br /> , sight distance on the prcposed bridge on the <br /> Luce Line Trail, Orono Orchard Roade They have <br /> • no funds in the budget for this cost, so that <br /> it would have to be delayed to the fiscal year <br /> � 1976? then it would be done at no cost to Orono. <br /> • <br /> � The City Council instructed the engineer to MAPLE AVENUE SURVEY <br /> locate T•Zaple Avenue at 3030 Casco Point Road <br /> � by a survey. <br /> � <br /> • <br /> • <br /> • <br />