|
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc.
<br /> Sabre Plumbinq&Heatinq 195 Kintyre Ln Orono
<br /> PI mouth MN 55447 ___._. __ _ Page 3
<br /> ----- --__- -
<br /> Load Preview Report
<br /> ' Net ft' Sen Lat Net Sen Hts CIS Act Duct
<br /> Scope Ton /Ton' Area Gain, Gain Gain I Loss g 9 Size
<br /> CFM CFM CFM
<br /> _ _--- _ _.. _- ---- --- __._ __. m -
<br /> Building 3.86 1,711 6,605 39,437 6,877 46,314 117,015 1,498 1,797 1,797
<br /> System 1 3 86 1,711 6,605 39,437 6,877 46,314 117,015 1,498 1,797 1,797 18x18
<br /> Ventilation 1,076 3,547 4,623 5,080
<br /> Duct Latent 1,447 1,447
<br /> Zone 1 -Clg. 17%,Htg.30% 1,748 7,850 0 7,850 33.892 454 368 368 9x9
<br /> 1-Basement 1,748 7,850 0 7,850 33,892 454 368 368 4--6
<br /> Zone 2-Clg 43%,Htg_25°/ 1,748 19,998 1,883 21,881 27,932 374 937 937 12x14
<br /> 2-Main floor 1,748 19,998 1,883 21,881 27,932 374 937 937 9--6
<br /> Zone 3-Clg 7°/,Htg 17°/ 814 3,219 0 3.219 18.476 247 151 151 5x5
<br /> 3-Sport Court 814 3,219 0 3,219 18,476 247 151 151 2--5
<br /> ZOne 4 Clg 33% Htg.28% 2 295 15.177 0 15,177 31,635 423 711 711 tOx14
<br /> 4-2nd floor 2,295 15,177 0 15,177 31,635 423 711 711 7--6
<br /> Sum of room airflows may be greater than system airflow because
<br /> system has multiple zones.
<br /> C:\...\Gonyea 195 Kintrye Ln Orono SIMPSON.rh9 Monday, June 30, 2014, 10:56 AM
<br />
|