Laserfiche WebLink
F. ABSORPTION WIDTH AbsorpHon ratio: 2 <br /> 1. Absorption wid�equals absorpUon ratio times rock layer width Site A <br /> 2.00 x 10.0 ft = 20.0 ft <br /> 6. MOUND SLOPE WIDTH d�LENGTH(Greaterthan 196) <br /> �, paMmslope absorption width=absorption width minus rodc layer width <br /> 20.0 feet - 10.0 feet= 10.0 ft <br /> 2. Cak;ulate mound size <br /> UPSLOPE <br /> a.Depth o�dean sand at upslope edge of rodc layer=3 feet minus dist�ce to resUicti�g layer(C1) <br /> 3.0 ft - 1.8 ft= 1.2 ft <br /> b.Mound height at the upsiope edge of rodc layer=depth of clean sand for separatron(G2a) <br /> at upslope edge plus depth of rodc layer(1 foot)to de�h�cover(1 foot) <br /> 1.2 ft+1ft+1 ft= 3.2 ft <br /> c.Upslope b�m multiplier based on land sbpe(see figure D-34) <br /> Selected berm mulGplier: 2.94 <br /> d.Upslope width=berm multiplier(G2c)times upslope mound height(G�): <br /> 2.94 x 3.2 ft = 10.0 ft <br /> DOWNSLOPE <br /> e.Drop in devation=rodc layer width(D2)times percent landslope(C5)1100 <br /> 10.0 ft x 9.0 % /100= 0.9 ft <br /> f.Downslape rtround height=depth of c�ean sand for siope diffe�nce(G2e) <br /> at downslope rock edge plus the mound height at the uPslope edge of rodc laye.r(2b) <br /> 0.9 ft + 3.2 ft= 4.1 ft <br /> g.Downslope berm multiplie.r based on percent land slope(see Figure D-34 <br /> Selected berm multiplier: 4.11 <br /> h.Dovmslope width=downslape multiplier(G2g)6mes downslope mound heiyh��2� <br /> 4.11 x 4.1 = 16.9 ft <br /> i.Select greater of G1 and G2h as the damslope widfh 1�•� � <br /> j.Total mound width is the sum of upslope(G2d)width plus rock layer width(02)plus downslope width(G2i) <br /> 10.0 ft+ 10.0 ft+ 17.0 ft= 37.0 ft <br /> k.Tot�mound length is the sum of upslope width(G2�plus rodc layer length(D3)plus upslope width(G2d) <br /> 10.0 ft + 63.0 ft+ 10.0 ft= 83.0 ft <br /> Final Oimensions stope>1% 37.0 ft x 83.0 ft <br /> I hereby rtify that all work has bcen comp�ted in acxordance with all applicable ordinances,rules&laws. <br /> (signature) 810(license#) %/D� vs(date) <br /> Page 2 of 5 <br />