My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#5639-variances/CUP-2007
Orono
>
Property Files
>
Street Address
>
K
>
Kelly Avenue
>
2507 Kelly Avenue - 20-117-23-12-0063
>
Resolutions
>
#5639-variances/CUP-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:50:04 PM
Creation date
3/30/2017 11:16:29 AM
Metadata
Fields
Template:
x Address Old
House Number
2507
Street Name
Kelly
Street Type
Avenue
Address
2507 Kelly Avenue
Document Type
Resolutions
PIN
2011723120063
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Page 3 of 7 <br /> , ��, '7, . <br /> shipped in flat sheets that measure 1-meter(40") square. <br /> 2. Da not build on frozen work or wet, satura.ted or muddy subgrade. 5 6 3 9 <br /> E. Protect partially completed paving against damage from other construction traffic when work is <br /> in progess, and untiI grass root system has matvred (about 3 to 4 weeks). Any barricades constructed <br /> must still be accessible by emergency and fire equipment during and after instalIation. <br /> F. Protect adjacent woric from damage during Grasspave2 installation. <br /> PART 2 - PRODUCTS <br /> 2.01 Availability <br /> A. Manufacturer: (Grasspave2, Hydrograw) Invisible Structures, Inc., 1600 Jackson Street., Suite <br /> 31Q, Golden,Colorado 80401. Call from USA and Canada.800-233-I510 toIl &ee, Internatioraal 303- <br /> 233-8383, Fax 303-233-8282. <br /> B. Local Sales Representative: <br /> (Contact Manufacturer) <br />� 2.02 Materials <br /> A. Base Course: Sandy gravel material from local sources commonly used for road base <br /> construction, passing the following sieve analysis. <br /> % Passine Sieve Size <br /> 100 3/4" <br /> 85 3/8" <br /> 60 #4. <br /> 30 #40 <br /> < 3 #200 <br /> l. Sources of the ma.terial can include either "pit run" or "crusher run." Crusher run material <br /> wiil genera.11y require sharp sand to be added to mixture (33%by volume) to ensure long term porosity. <br /> If there is difficuity in finding local sources to meet this sieve analysis, and altemative mixture can be <br /> � created by mixing 2/3 crushed drainage rock (0.75" dia) with 1/3 concrete or river sand. <br /> 2. Selected materials should be aeazly neutral in pH (range from 6.5 to 7.2) to provide adequate <br /> root zone development for turf. <br /> 3. Altemative materials such as crushed shell,limerock, aad/or crushed lava may be considered <br /> for base course use, provided they are mixed with sharp sand(33%), and brought to proper compaction. <br /> 6/25/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.