My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00679 - sprinkler system
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2750 Kelley Parkway - 33-118-23-12-0007
>
Permits/Inspections
>
2015-00679 - sprinkler system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 1:39:34 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Permits/Inspections
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />,` <br /> Page 4 - #4220 92-4026 <br />' 3 0 ENGINEERING REVIEW <br />� <br /> 3.1 Project Data <br /> The engineering recommendations made in this report are based on our understanding of the <br /> project as described in the following paragraphs. The recommendations are valid for a specific set <br /> of projert conditions. If the characteristics of the project change from those indicated in this <br />_ section, it is necessary that we be notified so we may determine whether the new conditions affect <br /> our recommendations. <br /> We understand it is proposed to construct new municipal facilities for the City of Orono. The initial <br /> portion of the construction will consist of a new public works building located in the southeast comer of <br /> the site. Located to the north of the pubiic works building at approximately the mid-point of the site <br />" along the eastern edge, a cold storage building is proposed, and a salt storage building located further <br />� <br /> to the north. Along the southwestern poRion of the site, a council chambers, city hall and police station <br />_ will be designed as individual suuctures attached by walkways. The initial phase of the work will invotve <br /> construction of a public works facility only. Also completed, but not included in this repoct, were two <br />�� soil borings for roadway, as well as three soil borings for a future water storage tank facility. <br /> Recommendations for the roadway and the water storage tank are provided in a separate report. Borings <br /> #12 through #16 are included on the sketch, however, for reference. <br /> Proposed first-floor elevations for each of the structures have been provided. We assume the construction <br /> will consist of single-story,slab-on-grade buildings without basements. Construction of basements would <br />- not be feasible due to tt�e relatively high groundwater tab�e. We assume lighter wood-framed construction <br /> , � twin c�t�+ tes�t�nq <br /> r�r+�r..-,.�n..n <br />
The URL can be used to link to this page
Your browser does not support the video tag.