Laserfiche WebLink
� '• � 1 <br /> Et\IERGI�' A�I�I�aL�Y�iS <br /> 1. Study rebates availabie to Xcel Energy business customers in Minnesota(electric and/or natural gas►. <br /> 2. Individuals with demonstrable experience,appropriate to the type of Study being performed must be responsible for conducting the Study. <br /> 3. The Engineering firm performing this Study must do so with impartiality towards equipment suppliers,distributors,and all equipment or product <br /> brand names. <br /> 4. The Study must be performed according to the Study Workscope Section of this application. <br /> 5. Xcel Energy makes no warranties regarding the Study.All such warranties are between the Engineering Firm and the Customer.Rebate qualifica- <br /> tions do not imply any representation or warranty of the Study by Xcel Energy. <br /> 6. Xcel Energy's decision relating to customer eligibility for the Study or other issues will be final and binding for all parties. <br /> 7. The Customer shall be responsible for directing the work of the consultant or the contractor;at no time shall the consultant or contractor be con- <br /> sidered an agent,employee,or a contractor of Xcel Energy. <br /> 8. The Xcel Energy Funding Authorization section of this application must be signed prior to initiation of the Study. <br /> 9. The Study must be completed within three(3)months of the Xcel Energy Funding Authorization Date. <br /> 10.Xcel Energy reserves the right to perform pre-and post-installation energy testing and data collection. <br /> 11.Xcel Energy reserves the right to accept or reject any application,Study,or portion thereof. <br /> 12.Xcel Energy will pay study rebate upon customer payment of study to engineering firm. <br /> Requirements:The purpose of the Study is to provide a customer with the necessary business case justification to implement the energy-saving <br /> opportunity.All studies should include the information listed in the business case justification and the program requirements section. <br /> A.Executive summary <br /> Report will include an Energy Conservation Opportunities form briefly describing the purpose of the Study,existing conditions,and options considered. <br /> B.Introduction <br /> In addition,the report will contain an introduction section consisting of customer information and an Xcel Energy(Company)disclaimer. <br /> C.Study summary <br /> A Professional Engineer will fill out the Energy Conseroation Opportunities(ECO)form(i.e.material and/or format provided by Company)of capital <br /> costs,incentives,energy reduction/increase in kilowatts,and reduction/increase in natural gas MCF,reduction/increase in district cooling energy <br /> use,reduction/increase in other fuels/utilities. , <br /> D.Project description <br /> The following will be provided for retrofit opportunities: <br /> •Description of existing equipment,including sketches,drawings,flow diagrams,photos as necessary to explain and describe the project;and <br /> •Explanation of how the proposed project will modify the plant process or building. <br /> The following will be provided for equipment upgrade situations: <br /> •Description of the proposed energy alternative�s)and the comparable"standard"or"normal"alternative; <br /> •Description of plant upgrade and how the different energy alternatives will affect operation and function; <br /> •Description,sketches,drawings or flow diagrams as necessary to explain and describe the energy use relative to the"standard'alternatives. <br /> E.Energy estimate <br /> The following energy-use calculations and calculated estimates will be provided with regard to the project scope of work: <br /> • A calculated estimate of annual electric energy use in kWh,month�y maximum demand in kW and/or natural gas MCF.This calculation will include <br /> an indication of when,during the day and year,the demand and energy consumption will occur. <br /> • A calculated estimate of annual electricity/natural gas reductions/increases in use and cost,based on the rate Schedule most appropriate for the <br /> customer.Request rate information from the customer's Company account manager. <br /> • Indication of how estimate data was derived(e.g.,theoretical calculations,field measurements,manufacturer's data,etc.) <br /> • An estimate of the project cost and payback period. <br /> • A description of the proposed modifications to improve energy efficiency. <br /> F.Measurement of energy <br /> The Study will include a plan to verify the electric energy use(e.g.,after the project is implemented how will the building owner or plant manager know <br /> that the project is using/reducing the energy estimated►.Costs associated with verification must be identified. <br /> G.Non-energy project impacts <br /> • The Study will estimate other quantifiable benefits and costs to implement the potential energy project,such as impact on production or building <br /> function levels,operating and maintenance costs,and plant reliability.Positive and negative impacts will be considered. <br /> • The Study also will provide an indication of project impacts that may be difficult to quantify,such as safety and environmental considerations and <br /> product quality. <br /> p.3 of 4 09-06-537 O6/2009 <br />