My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 12:02:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orono <br /> Project 614-059Q2 <br /> February 12, 2015 <br /> Page 2 i <br /> Visual Examination of the Field-Made Welds <br /> Visual examination of the field welds was conducted in accordance with Americah Welding Society <br />(AWS) D1.1-2010, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and <br /> specifications. <br /> Tension-Control Bolted Connection Observations I <br /> Tension-control bolted connection observations were conducted to determine if khe bolt holes were <br /> filled, if the correct bolts were used, if the nuts were fully engaged and if the splined end of the tension- <br /> control bolts had separated from the body of the bolt. Removal of the splined er�d is a direct indicator <br /> the bolt has been torqued to the minimum snap-off load. At connections where the splined ends were <br /> not,or could not be removed,the torque applied to the bolt by the contractor w�s determined using a <br /> hand-held torque wrench. In addition, each connection was observed for fit-up a�d to determine if the <br /> various plies were in contact with one another. <br /> Hex-Head Bolted Connection Observations � <br /> Hex-head bolting observations were performed to determine if the bolt holes we�e filled, if the correct <br /> bolts were used, if the nuts were fully engaged and if they appeared to be snug tight. Each hex-head <br /> bolted connection was observed for fit-up and to determine if the various plies were in contact with one <br /> another. Random bolts were also selected at various connections to determine if the nuts were snug <br /> tight. This was done using a wrench and cheater bar. I <br /> Metal Deck Weld and Fastener Observations ' <br /> Metal deck weld observations were conducted in general accordance with AWS D�3-2008,Section 6.0 <br /> requirements and the requirements of the project plans and specifications. Items reviewed included the <br /> quality, size and spacing of the welds. In addition, the location and the completer�ess of the side-lap <br /> fastener installation were observed and evaluated. <br /> Cold Form Metal-Framing Mechanical Fasteners � <br /> Visual observations were conducted to determine if the mechanical fasteners use in the cold form <br /> metal-framing construction were placed in conformance with the requirements o�the structural details, <br /> plans and specifications. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.