Laserfiche WebLink
B R A�I N Braun Intertec Corporation Phone: 952.995.2000 <br /> I 1001 Hampshire Avenue S Fax: 952.995.2020 <br /> IN T E RT E C Minnea�lis, MN 55438 Web: braunintertec.com <br /> ��r���. <br /> February 12, 2015 Project B14-059a2 <br /> Ms.lessica Loftus <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Re: Structural Steel Special Inspection Procedural and Final Report <br /> Orono Police Department Expansion <br /> 2370 Kelly Parkway <br /> Orono, MN <br /> Dear Ms. Loftus: I <br /> Please find attached to this procedural report the Structural Steel Special Inspectipn Final Report for the <br /> Orono Police Department Expansion Project and the supporting Speciai Inspectiorl Daily Reports. <br /> Special Inspection and Testing Procedures <br /> The special inspection services were periodically provided by International Code Gouncil (ICC) certified <br /> special inspectors in accordance with the requirements of the Minnesota State Bu�ilding Code, <br /> Chapter 17 of the International Building Code (IBC) and the project plans and spec�fications. <br /> The purpose of special inspections is to provide a review of the contractor's work designated by the <br /> project structural engineer as needing special inspection under the guidelines of tlhe IBC to determine <br /> compliance with the approved construction documents. The special inspector does not have the <br /> responsibility or authority to, nor is it the intent of special inspections to have thecn,judge or modify <br /> the construction documents. Only the structural engineer of record can do this. ! <br /> As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize <br /> the results of our inspections and testing. A copy of this report was provided to the contractor's site <br /> representative for their review and records. As part of this report, items needing correction or <br /> discrepancies observed from the approved construction documents were noted. 1�Ale also summarized <br /> the discrepancies documented in a Discrepancy Log. As needed,we also contacted the project structural <br /> engineer for additional clarification on specific issues related to the drawings or discrepancies observed. <br /> Plans and Specifications <br /> The plans and project documents available at the site were used for our inspections. From time to time, <br /> we received plan modifications from the structural engineer. When received,the�e were used to <br /> evaluate the work completed in the field. <br /> �; �r�E <br />