Laserfiche WebLink
City of Orono <br /> Project B14-05902 <br /> February 12, 201� <br /> Page 2 � <br /> Conclusion <br /> Based upon the inspections conducted,the testing performed and the attached reports, it is our <br /> professional judgment that, to the best of our knowledge,the inspected �niork was performed and <br /> completed in accordance with the approved plans, specifications, structural-engineer-provided <br /> modifications and applicable workmanship provisions of the Minnesota State Building Code and <br /> the Internat�onal Building Code. <br /> Inspecting Firm: Braun Intertec Corporation <br /> I hereby certify that this plan, specification or report <br /> was prepared by me or under my direct supervision <br /> and that I am a duly Licensed Professional Engineer <br /> under the laoivs of the State of Minneso�a. <br /> �%�� `�`NNNNF wlHq���'i <br /> ``��.���p�(��--��NHFs�,y� <br /> ��. g; �•�A��� <br /> C stopher R. Kehl, PE ?,..;CNR� ��= <br /> Principal-Senior Engineer ��� a��R•��? <br /> License Number: 43459 :�i; :�u� <br /> February 12, 2015 %;��«. � .•�d� <br /> /� A e� ����! <br /> `�s •����` <br /> �i e. . <br /> / •�e• 4 <br /> ��i,ri���S$��ON P���`` <br /> Attachments: <br /> Special Inspection Daily Reports 1 through 3 <br /> Summary of Discrepancy Log I <br /> �� �`�'.� ��� <br /> �i�� L�T�� <br />