My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 12:02:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���� Braun Intertec Corporation Phone: 952.995.2000 <br /> 11001 Hampshire Avenue S Fax: 952.995.2020 <br /> Minneapolis, MN 55438 Web: braunintertec.com <br /> �������� <br /> '['bs Ss�n�Xs+a��i7�d�. <br /> Structural Steel Special Inspection Final Report <br /> City of: Orono Date: Fe�bruary 12, 2015 <br /> Attention: Ms.Jessica Loftus <br /> Project: Orono Police Department Expansion sR <br /> 2370 Kelly Parkway � <br /> Orono, MN 55356 <br /> Braun Intertec Project: 614-05902 <br /> In accordance with the Minnesota State Building Code, Section 1704 of thE� International Building Code <br /> and the agreed-upon scope of services, the required special inspections arid testing have been provided <br /> for the following items: <br /> Bolting. The bolted connections detailed in the attached Special Inspection Daily Reports were <br /> observed in general accordance with the requirements of the plans and s��ecifications.There are <br /> currently no outstanding or unresolved bolted connection-related issues. <br /> Structural Field Welding. The welded connections detailed in the attached Special Inspection Daily <br /> Reports were observed in general accordance with the require�nents of Rrie project plans and <br /> specifications. Discrepancies were noted and documented. These connec:tions were found to be <br /> acceptable following the required corrections.There are currently no out�;tanding or unresolved <br /> structural welding-related issues. <br /> M�tal Deck Welding and Fasteners. The metal deck welding a�nd side-la��fasteners detailed in the <br /> attached Special Inspection Daily Reports were observed in gerieral accorciance with the requirements <br /> of the project plans and specifications.There are currently no autstandin@,or unresolved decking- <br /> related issues. <br /> Mechanical Fasteners. The mechanical fasteners detailed in the attached Special Inspection Daily <br /> Reports were observed in general accordance with the requirements of th;e plans and specifications. <br /> Discrepancies were noted and documented. These connections were found to be acceptable following <br /> the required corrections.There are currently no outstanding or�unresolve�� mechanical fastener-related <br /> issues. <br /> ,� ►=���. <br />
The URL can be used to link to this page
Your browser does not support the video tag.