My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 12:02:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Orono <br /> Project 814-059a2 <br /> February 12, 2015 <br /> Page 2 <br /> Visual Examination of the Field-Made Welds <br /> Visual examination of the field welds was conducted in accordance with American Welding Society <br /> (AWS) D1.1-2010, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and <br /> specifications. <br /> Tension-Control Bolted Connection Observations <br /> Tension-control bolted connection observations were conducted to deterrnine if the bolt holes were <br /> filled, if the correct bolts were used, if the nuts were fully engaged and if the splined end of the tension- <br /> control bolts had separated from the body of the bolt. Removal of the splined end is a direct indicator <br /> the bolt has been torqued to the minimum snap-off load. At connections where the splined ends were <br /> not, or could not be removed,the torque applied to the bolt by the contiractor was determined using a <br /> hand-held torque wrench. In addition, each connection was ok�served for fit-up and to determine if the <br /> various plies were in contact with one another. <br /> Hex-Head Bolted Connection Observations <br /> Hex-head bolting observations were performed to determine if the bolt hales were filled, if the correct <br /> bolts were used, if the nuts were fully engaged and if they appeared to be snug tight. Each hex-head <br /> bolted connection was observed for fit-up and to determine if the various plies were in contact with one <br /> another. Random bolts were also selected at various connections to detarmine if the nuts were snug <br /> tight. This was done using a wrench and cheater bar. <br /> Metal Deck Weld and Fastener Observations <br /> Metal deck weld observations were conducted in general accordance with AWS D1.3-2008, Section 6.0 <br /> requirements and the requirements of the project plans and specificatioris. Items reviewed included the <br /> quality, size and spacing of the welds. In addition,the location �and the cc�mpleteness of the side-lap <br /> fastener installation were observed and evaluated. <br /> Cold Form Metal-Framing Mechanical Fasteners <br /> Visual observations were conducted to determine if the mechanical fasteners used in the cold form <br /> metal-framing construction were placed in conformance with the require�ments of the structural details, <br /> plans and specifications. <br /> � ���� �.� � <br /> {���a;'- ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.