My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 12:02:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���� � Braun Intertec Corporation Phone: 952.995.2000 <br /> 11001 Hampshire Avenue S Fax: 952.995.2020 <br /> �,� Minneapolis, MN 55438 Web: braunintertec.com <br /> �II �i������ <br /> The Scienca Yon Builcl fln. <br /> February 12, 2015 Project 814-05902 <br /> Ms.Jessica Loftus <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Re: Structural Steel Special Inspection Procedural and Final Report <br /> Orono Police Department Expansion <br /> 2370 Kelly Parkway <br /> Orono, MN <br /> Dear Ms. Lo�`tus <br /> Please find attached to this procedural report the Structural Steel Special Inspection Final Report for the <br /> Orono Police Department Expansion Project and the supporting Special Inspection Daily Reports. <br /> Special Inspection and Testing Procedures <br /> The special inspection services were periodically provided by International Code Council (ICC) certified <br /> special inspEctors in accordance with the requirements of the Minnesota�State Building Code, <br /> Chapter 17 of the International Building Code (IBC) and the project plans and specifications. <br /> The purpose of special inspections is to provide a review of the contractur's work designated by the <br /> project struc:tural engineer as needing special inspection under the guidelines of the IBC to determine <br /> compliance with the approved construction documents. The special inspector does not have tne <br /> responsibility or authority to, nor is it the intent of special inspections to have them,judge or modify <br /> the construction documen#s. Only the structural engineer of record can ��o this. <br /> As the special inspections were completed, a Special Inspection Daily ReK►ort was prepared to summarize <br /> the results of our inspections and testing. A copy of this report was provided to the contractor's site <br /> representative for their review and records. As part of this report, items needing correction or <br /> discrepancies observed from the approved construction documents were� noted. We also summarized <br /> the discrepancies documented in a Discrepancy Log. As needed, we also contacted the project structural <br /> engineer for additional clarification on specific issues related to the drawings or discrepancies observed. <br /> Plans and Specifications <br /> The plans and project documents available at the site were used for our inspections. From time to time, <br /> we received plan modifications from the structural engineer. When received, these were used to <br /> evaluate the work completed in the fie�►d. <br /> .La t.+.>r <br />
The URL can be used to link to this page
Your browser does not support the video tag.